Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF SERVICES, TIME SCHEDULE AND FEE SCHEDULE <br /> Task 5.2.1 — PEER (Permit Engineering Evaluation Report) Review Process <br /> WRECO will take the lead in gaining approval for the PEER and preparing the technical reports, structural <br /> calculations and design plans & specifications required to attain Caltrans approval. This task includes the <br /> following: <br /> O Project coordination and three (3) additional meetings with the City. <br /> o Attend four (4) Caltrans meetings. <br /> O Prepare the PEER report and technical reports needed for the PEER process. <br /> O Review all design features to ensure that the Project meets Caltrans' standards. <br /> O Prepare geotechnical recommendations for installing utilities under pathway. Includes pile <br /> capacities analysis to be included in recommendations. <br /> O Prepare pressure diagrams for the tieback wall that includes seismic loading and lateral loading. <br /> Also provide vertical and lateral capacities of 14-inch diameter steel piles. <br /> O Update Log of Test boring sheets to meet Caltrans requirements. <br /> O Revise structural design to meet Caltrans 2015 Standard Plans & Specifications. <br /> O Provide structural design and check calculations based on the latest AASHTO Bridge Design <br /> Specifications. <br /> O Resubmit design plans and specifications for Caltrans Review (95% and Final) <br /> Deliverables <br /> O Caltrans PEER Report (Draft and Final) - PDFs <br /> O 95% Design Submittal to Caltrans (includes structural calculations) — PDF <br /> o Final Design Submittal to Caltrans — PDF <br /> Task 5.2.2 — Regulatory Agency Permitting <br /> WRECO will assist the City in gaining regulatory agency permit approvals. This task includes the <br /> following: <br /> 0 Permitting coordination <br /> O Responding to agency comments <br /> O Attend two (2) additional site visits <br /> Deliverables <br /> O Responses to Agency Permitting Comments — PDF <br /> Task 5.2.3 — Utility Coordination <br /> REV: 10-03-17 PR <br /> Page 3 of 5 <br /> ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />