Laserfiche WebLink
Engineering Design Services for 101 Pedestrian Crossing <br /> Man-Hour and Fee Estimate for the WRECO Project Team Tasks <br /> Prepared for the City of Redwood City <br /> Prepared by the WRECO Project Team August 3, 2017 <br /> Project Main <br /> Subtotal Subtotal <br /> Task Task Description Fee Hours <br /> PHASE !! <br /> 5 CONSTRUCTION DOCUMENTS <br /> Caltrans Peer Report (Draft) $ 18,960.00 162 <br /> Caltrans Design Submittal $ 21,320.00 176 <br /> Structural Calculations (Draft) $ 33,340.00 214 <br /> Internal QA/QC $ 1,285.00 7 <br /> Respond to Caltrans Review $ 2,790.00 16 <br /> Caltrans Peer Report (Final) $ 10,640.00 90 <br /> Caltrans Design Submittal $ 6,650.00 50 <br /> Structural Calculations (Final) $ 1,070.00 5 <br /> Internal QA/QC $ 1,285.00 7 <br /> Review Meetings with Caltrans (4) ; 3,610.00 18 <br /> Regulatory Agency Permitting Coordination $ 2,240.00 16 <br /> Respond to Comments $ 620.00 4 <br /> Additional Site Visits (2) $ 900.00 6 <br /> Review of City Waterline Project 540.00 4 <br /> SD Pump Station Coordination & Design 5 1 1,718.00 86 <br /> Utility Coordination (PG&E and AT&T) S 2,720.00 16 <br /> Coordination Meetings (3) 5 1,530.00 9 <br /> Prepare Exhibits (Typ Section & AT&T Relocate) $ 570.00 5 <br /> Design of PG&E conduits under path $ afr4,560.00 32 <br /> _At <br /> Subtotal $ 126,348.00 923 <br /> 6 CONSTRUCTION SUPPORT <br /> Biological Support ist <br /> Biological Surveys S 5,080.00 50 <br /> Preconstruction Preparation $ 760.00 8 <br /> Evironmental Awareness Training S 1,680.00 18 <br /> Biological Monitoring during Cofferdam Install $ 3,800,00 40 <br /> Post Construction As-Builts Report 5 4,520.00 46 <br /> Post Construction Planting Reports $ 4,520.00 46 <br /> Subtotal $ 20,360.00 208 <br /> Phase II Subtotal $ 146,708.00 1131 <br /> OTHER DIRECT COST <br /> Travel S 800.00 <br /> 700 Reproduction $ 500.00 <br /> Supplemental Topographical Survey $ 3,330.00 <br /> Potholing (6 Locations) $ 7,334.00 <br /> ODC Subtotal $ 11,964.00 <br /> Total Amendment Cost I $158,672.00 ] 1131 J <br /> $ 158,672.00 <br /> ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />