Laserfiche WebLink
Assumptions <br /> • PEER review process will be the Caltrans approval route. <br /> O Fact sheets limited to two (2) non-standard features (mandatory or advisory). <br /> O Two submittals only are needed for Caltrans PEER review process. <br /> O Newly installed SD pump station and waterline does not significantly impact design of this <br /> project. <br /> O The utility agencies will use AT&T and PG&E's temporary and proposed design. Any easement <br /> requirements will be the responsibility of the utility agencies. <br /> ® Assumes previous survey controls are existent and available. <br /> O City will be responsible to ensure regulatory agencies permit requirements are met. <br /> O City will be responsible to make all submittals to regulatory agencies. <br /> O Only two Post-Construction Planting Reports will be prepared; one post-planting report, as <br /> required by the Regional Water Quality Control Board conditions, and a year one planting report, <br /> as required by the California Department of Fish and Wildlife permit conditions. <br /> O The U.S. Fish and Wildlife Service and National Marine Fisheries have not issued Letters of <br /> Concurrence or Biological Opinions for the project; therefore, any additional potential biological <br /> monitoring and/or reporting costs have not been included in this estimate. <br /> Task performed will be billed on 2017 billing rates attached hereto. <br /> REV: 10-03-17 PR <br /> Page 5 of 5 <br /> ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />