Laserfiche WebLink
Engineering Design Services for 101 Pedestrian Crossing <br />Work -Hour and Fee Estimate for the WRECO Project Team Tasks <br />Prepared for the City of Redwood City <br />Prepared by the WRECO Project Team August 9, 2018 <br />Task Task Description <br />Project Team <br />PHASE <br />Subtotal <br />5 <br />CONSTRUCTION DOCUMENTS <br />Fee <br />5.3 <br />100% Design PS&E (Additional Effort) <br />2,500.00 <br />20 <br />Redesign for Waterline <br />2,496.00 <br />12 <br />Redesign Walls, footing, piles, slabs <br />6,568.00 <br />64 <br />Structural Calculations <br />3,490.00 <br />26 <br />Plan Revisions <br />2,496.00 <br />12 <br />Update Specifications & Cost Estimate <br />4,972.00 <br />43 <br />Access Gate Relocation <br />780.00 <br />6 <br />Gate Post Foundation Design <br />7,560.00 <br />40 <br />Plan Revisions <br />30,862.00 <br />223 <br />Update Specifications & Cost Estimate <br />4,008.00 <br />5.4 <br />Value Engineering <br />5,680.00 <br />42 <br />$ <br />Subtotal <br />6 <br />CONSTRUCTION SUPPORT <br />7,624.00 <br />6.2 <br />Additional Construction Support due to Caltrans PEER Process <br />4,332.00 <br />Respond to Bid RFls <br />$ <br />19,908.00 <br />Respond to Construction RFls <br />$ <br />9,052.00 <br />Construction Conference Calls (4 total) <br />$ <br />Review Submittals <br />$ <br />53,056.00 <br />Review Shop Drawings <br />Review & Approve Construction Change Orders <br />$ <br />83,918.00 <br />As -Built Plans <br />$ <br />300.00 <br />Subtotal <br />150.00 <br />Phase 11 Subtotal <br />OTHER DIRECT COST <br />$ <br />450.00 <br />Travel <br />700 <br />Reproduction <br />ODC Subtotal <br />Total Amendme 1 $84,368.00 1625 <br />Page 4 of 8 <br />ATTY/AGR/2018/AMENDMENTS/AMEND NO.4 WRECO-US 101 UC <br />REV: 08-29-18 PR <br />Project Team <br />Subtotal <br />Subtotal <br />Fee <br />Hours <br />$ <br />2,500.00 <br />20 <br />$ <br />2,496.00 <br />12 <br />$ <br />6,568.00 <br />64 <br />$ <br />3,490.00 <br />26 <br />$ <br />2,496.00 <br />12 <br />$ <br />4,972.00 <br />43 <br />$ <br />780.00 <br />6 <br />$ <br />7,560.00 <br />40 <br />$ <br />30,862.00 <br />223 <br />$ <br />4,008.00 <br />32 <br />$ <br />5,680.00 <br />42 <br />$ <br />2,452.00 <br />16 <br />$ <br />7,624.00 <br />52 <br />$ <br />4,332.00 <br />32 <br />$ <br />19,908.00 <br />156 <br />$ <br />9,052.00 <br />72 <br />$ <br />0 <br />$ <br />53,056.00 <br />402 <br />$ <br />83,918.00 <br />625 <br />$ <br />300.00 <br />j <br />150.00 <br />$ <br />450.00 <br />Total Amendme 1 $84,368.00 1625 <br />Page 4 of 8 <br />ATTY/AGR/2018/AMENDMENTS/AMEND NO.4 WRECO-US 101 UC <br />REV: 08-29-18 PR <br />