Laserfiche WebLink
I <br /> Consultant shall complete 35% design submittal within 60 Calendar Days after City's approval <br /> of the conceptual design. <br /> Consultant shall complete 95% design submittal within 60 Calendar Days after City's approval <br /> of the design at 35%. <br /> Consultant shall complete final design submittal within 30 Calendar Days after City's approval of <br /> the design at 95%. <br /> ATTY/AGR/2012.159/BRAD COX,ARCHITECTS INC. <br /> REV:09-24-12 VR <br /> Page 12 of 13 <br />