My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:46:19 PM
Creation date
10/18/2012 3:58:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 5 <br /> FISCAL IMPACT <br /> The cost of the entire project will ultimately depend on whether the pilot is made <br /> permanent or not. The cost to install the pilot is $110,000. Making the pilot permanent <br /> would cost an additional $30,000, while removing the pilot would cost an additional <br /> $26,000. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that this pilot project meets <br /> the California Environmental Quality Act (CEQA) exemption criteria as set forth in <br /> Section 15306, as a pilot project of limited duration and scale. During the pilot project, <br /> data will be collected to inform the environmental analysis of a permanent modification <br /> to the roadway design. <br /> I^ ( ,;;� <br /> �" ���`--^— � `���: <br /> � <br /> I <br /> JESSICA MANZI <br /> SENIOR TRANSPORTATION COORDINATOR <br /> G�� <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> �� <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTAC H M E N TS <br /> -Plan drawings of conceptual design <br /> -Summary of community feedback <br />
The URL can be used to link to this page
Your browser does not support the video tag.