Laserfiche WebLink
7.A. - Page 5 <br /> FISCAL IMPACT <br /> The cost of the entire project will ultimately depend on whether the pilot is made <br /> permanent or not. The cost to install the pilot is $110,000. Making the pilot permanent <br /> would cost an additional $30,000, while removing the pilot would cost an additional <br /> $26,000. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that this pilot project meets <br /> the California Environmental Quality Act (CEQA) exemption criteria as set forth in <br /> Section 15306, as a pilot project of limited duration and scale. During the pilot project, <br /> data will be collected to inform the environmental analysis of a permanent modification <br /> to the roadway design. <br /> I^ ( ,;;� <br /> �" ���`--^— � `���: <br /> � <br /> I <br /> JESSICA MANZI <br /> SENIOR TRANSPORTATION COORDINATOR <br /> G�� <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> �� <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTAC H M E N TS <br /> -Plan drawings of conceptual design <br /> -Summary of community feedback <br />