My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Verde Design
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 Verde Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2012 9:51:37 AM
Creation date
10/23/2012 9:51:36 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design
PROJECT NAME
Fair Oaks Elementary School Synthetic Turf Replacement
RMP File Number
304.5
Date
10/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Consultant shall prepare a 75%construction drawing, specifications <br /> and cost estimate for City's review. <br /> b. Consultant shall submit three(3) copies of the plans and specifications <br /> to City for review. <br /> B. Final (100%) Submittal <br /> a. Based on 75% submittal comments Consultant shall prepare 100% <br /> construction drawings, specifications and final cost estimate for the <br /> City's review. <br /> b. Consultant shall submit original drawings and specifications. City shall <br /> provide Consultant with template contract document sections 000 -700 <br /> responsible for completion. <br /> C. Consultant to attend final meeting with the City to provide final documents <br /> and discuss delivery schedule and possible chall enges. <br /> D. Consultant to provide an overall project schedule. <br /> C. Construction Administration Services Cost: Not to exceed $8,500.00 <br /> Consultant shall: <br /> 1. Attend pre-construction meeting. <br /> 2. Process and coordinate submittals and shop drawings. <br /> 3. Attend three (3) construction m eetings at the proj ect site. <br /> 4. Evaluate change orders. <br /> 5. Evaluation substitution requests <br /> 6. Provide general administration and coordination. <br /> 7. Provide one (1) substantial completion walkthrough for the site work and generate a <br /> punch list. <br /> TIME SCHEDULE: <br /> Scope Item A. Project Start-up, Review of Existing Conditions and Testing, etc. —Three <br /> (3) weeks from Notice to Proceed <br /> Scope Item B. Construction Documentation—Four(4)weeks from City's approval of the <br /> 75% design submittal <br /> Scope Item C. Consultant shall perForm as directed by the City and in coordination with <br /> the project schedule <br /> ATTY/AGR/2012.169/DSA VERDE 25250 <br /> REV:10-15-12 VR <br /> Page 11 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.