My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-11-05
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-11-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:47:39 PM
Creation date
11/1/2012 2:26:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
11/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 13 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND TIME SCHEDULE <br /> PROJECT DESCRIPTION: <br /> The City of Redwood City is in need of a new storage tank and pump station at the California <br /> Way Water Station. The new California Water Tank will provide operational, emergency, and fire <br /> storage for the California Pressure Zone and indirectly to the Wilmington North and Easter Bowl <br /> Pressure Zones. The tank will have two (2) inlet supply lines. The primary feed will be from a <br /> new 12-inch pipeline from the Lakeview Pump Station and a secondary supply will be from the <br /> 16-inch High-Line fed by the Glenloch Pump Station. The tank outlet will gravity feed the <br /> California Pressure Zone and will also provide the suction supply to the new California Pump <br /> Station. The California Pump Station will replace an aging outdoor facility with a new pump <br /> station enclosed in a building. <br /> SCOPE OF SERVICES: <br /> The California Water Tank and Pump Station Project shall consist of the following primary <br /> elements: <br /> • Design for a new water tank, exact size to be determined but will be within the 0.75 to <br /> 1.0 million gallon (mg) range. Tank shall be constructed of either steel, prestressed <br /> concrete, or conventionally reinforced concrete. <br /> • Design for a new water pump station to pump from the new California tank to the Easter <br /> Cross or Easter Bowl zones. <br /> • Design for a new pump station discharge pipeline from the new California Pump Station <br /> to connect to existing piping adjacent to the Easter Bowl tank. <br /> TASK 1 — PROJECT MANAGEMENT <br /> Consultant shall provide overall project management for the project. This task shall consist of <br /> the following: <br /> 1. Provide project coordination, communication with the City, development of the <br /> project work plan; preparing a project design schedule as well as monitoring and <br /> updating that schedule; tracking and reporting job progress on a monthly basis. <br /> 2. Perform Quality Assurance and Quality Control reviews of the design at each <br /> project milestone. <br /> 3. Perform a constructability review at the 65% and 100% design milestones. <br /> 4. Consultant shall attend six (6) meetings; project kick-off ineeting; <br /> Preliminary Design review meeting (30%); 65% Design review meeting; <br /> 100% Final Design review meeting; pre-bid meeting; and pre-construction <br /> meeting. <br /> TASK 2— SURVEYING AND SUPPLEMENTAL UTILITY RESEARCH <br /> The City has completed the topographic base mapping for the project to include the proposed <br /> tank and pump station site as well as the discharge pipeline alignment. The survey map and <br /> digital files (in AutoCAD format) will be provided to the Consultant for review and use during <br /> the project. Consultant shall perform utility research and review the City's provided utility <br /> mapping and recommend modifications, if any. Consultant shall augment utility information <br /> based on available record information from the City and private utility companies as well as <br /> conduct a field visit to observe existing structures, trees, and topographic features and <br /> evaluate their location on the existing map and make minor adjustments if needed based on <br /> what is observable in the field. Consultant shall bring to the City's attention any significant <br /> discrepancies in the survey map if and when identified. <br /> ATTY/AGR/2012.170/DSA INFRASTRUCTURE ENGINEERING CORP <br /> REV: 10-17-12 VR <br /> Page 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.