6.1.B. - Page 16 <br /> meeting shall be scheduled with City staff after review of the preliminary design study submittal. <br /> The goal of the scheduled meeting shall be to arrive at consensus on the design elements and <br /> layout prior to proceeding with the 65% Initial Design. <br /> TASK 4— INITIAL DESIGN (65% DESIGN SUBMITTAL) <br /> Following preparation of the Preliminary Design, and with the City's approval, Consultant shall <br /> proceed with the Initial Design and the preparation of the improvement plans and specifications. <br /> Consultant assumes the work under this task shall consist of design of a circular steel tank with <br /> a tiered retaining wall system; design of a concrete tank (whether circular prestressed or <br /> conventionally reinforced rectangular) is addressed under a separate, optional work task. <br /> Specific tasks shall consist of the following: <br /> 1. Consultant shall prepare for the sixty-five percent (65%) complete <br /> construction drawings consisting of plan views, profiles, cross-sections, <br /> construction notes, demolition plan, pipeline plan and profiles, detailing of <br /> major components, construction notes, utility connection points, <br /> specifications (CSI format) outline, construction cost estimates, <br /> construction schedule, details, catalogue cuts and product literature for <br /> major equipment, and engineering calculations. Prepare and submit draft <br /> pump station and tank control strategy. <br /> 2. Consultant shall perform local SCADA system design and provide draft <br /> local SCADA strategy/programming report which discusses PLC <br /> programming requirements and responsibilities. <br /> 3. Consultant shall submit contract documents to California Department of <br /> Public Health (CDPH) for review at the 65% review level and incorporate <br /> comments to the 100% design submittal to pursue "permit to operate". <br /> 4. Consultant shall perform initial constructability review. <br /> Five (5) sets of the sixty-five percent (65%) plans, specification outline, and Engineer's Estimate <br /> shall be presented to the City for review. A marked set will be returned along with City staff s <br /> comments and/or request for clarifications to Consultant for revision. One meeting shall be <br /> scheduled with City staff after review of the 65% submittal prior to proceeding with the 100% <br /> Final Design Submittal. <br /> TASK 5— FINAL DESIGN (100% DESIGN SUBMITTAL) <br /> Consultant shall perform the final design task, as follows: <br /> 1 . Incorporate 65% Design Submittal review comments. Prepare 100% <br /> Design Submittal consisting of complete construction documents including <br /> drawings, specifications and cost estimates. <br /> 2. The 100% Design Submittal shall consist of demolition plan, site grading <br /> and piping plan, general and construction notes, connection details, <br /> electrical details, structural details, technical specifications, and estimate <br /> of construction costs. The design calculations shall consist of final <br /> engineering calculations, miscellaneous technical data, maintenance <br /> considerations and catalogue cuts for major equipment. <br /> 3. Submit final control strategy report and final (tested) SCADA/PLC program. <br /> 4. Perform final constructability review. <br /> 5. The 100% Design Submittal shall be ready for signature and submitted to <br /> the City for review and approval. A marked set will be returned along with <br /> staffs comments and/or request for clarifications for revision. <br /> Consultant shall furnish one (1) set of full-size final plans and specifications for the project. Both <br /> sets of documents shall bear the responsible engineer's wet stamp and signature with a license <br /> ATTY/AGR/2012.170/DSA INFRASTRUCTURE ENGINEERING CORP <br /> REV: 10-17-12 VR <br /> Page 13 of 17 <br />