Laserfiche WebLink
Cost Estimate Exhibit "A" <br />For <br />Demolition and Utility Relocation <br />Downtown Underground Parking Facility <br /> <br />Item Description Estimated Cost <br />I Abate Hazardous waste from Bldgs $198,000.00 <br />2 Demolition $227,500.00 <br />3 Cap Utilities $20,000.00 <br />4 Relocate Waterline (bonded) $61,000.00 <br />5 Relocate Sewerline (bonded) $52,000.00 <br />6 Install new Joint Trench (bonded) $300,000.00 <br />7 Fencing/Traffic Control $50,000.00 <br />8 Dewatering $50,000.00 <br />9 Subtotal Direct Costs $958,500.00 <br />10 Indirect Costs Supervision, OH, profit (10%) $95,850.00 <br />11 Subtotal Direct & Indirect Costs $1,054,350.00 <br />12 Contingency (10%) $105,435.00 <br />13 Subtotal $1,159,785.00 <br />14 Administration/Support (5%) City/Designers $57,989.25 <br />15 Grand Total $1,217,774.25 <br />16 Rounded $1,220,000.00 <br /> <br /> Prepared by: <br /> B. Lee/City RWC <br /> w/input from <br /> 1 C. SwensonANentz <br /> <br /> <br />