My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Freedman Tung Bot... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Freedman Tung Bot... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 3:17:25 PM
Creation date
1/5/2004 12:49:19 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley (FTB)
PROJECT NAME
Precise Plan
RMP File Number
405
Date
11/10/2003
MO Ref
RD-03-26 RD-06-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Services, Page 4 <br /> <br /> alternatives and map diagrams to show areas of proposed policies/action(s) to address conditions <br /> identified in the Problems and Opportunities diagram, including housing and mixed use site <br /> concepts. <br /> <br />Task 2. Conununity Review of Broad Brush Downtown Revitalization Strategy <br /> A. City Staff Review Session at FTB in San Francisco <br /> B. Revise drawings and presentation to respond to comments at City Staff Review Session <br /> C. Meet with City Project Manager in Redwood City (same day as workshop) to coordinate <br /> presentation <br /> D. Community Workshop #1 - "Broad Brush" Strategy for Downtown <br /> <br /> 1. Prepare presentation and workshop materials; logistics coordination <br /> 2. Attend, set up, facilitate discussion, record comments <br /> <br />Task 3. Prepare Preliminary Land Use and Urban Design Recommendations <br /> <br />Based on comments received at the first community workshop and meetings with City Staff, prepare a package of <br />preliminary recommendations targeted at achieving the objectives outlined in those working sessions. <br /> <br /> A. Refine urban design and revitalization strategy (text and diagram including gateways) <br /> B. Refine redevelopment concept plan for Station Area (ECR, James to Fox, Depot Circle) <br /> C. Prepare preliminary land use planning areas diagram, use intensity concepts <br /> D. Prepare circulation diagram of proposed street network changes for Station Area <br /> E. Refine conceptual streetscape plans for Broadway (relate to Cinema block design) <br /> F. Refine conceptual streetscape plans for cinema blocks:Jefferson, Theater Way <br /> G. Prepare conceptual streetscape plan for Winslow, station area realigned streets <br />Task 4. Review Transportation & Parking Concepts with City Staff & Consultants <br /> A. Meet at FTB, review street network changes & station area circulation w staff, consultants <br /> B. Refine street network changes and Station Area circulation concept plan <br /> C. Review City staff proposals for shared parking, TDM and Downtown parking standards <br />Task 5. Community Review of Preliminary Precise Plan Concepts <br /> A. City Staff Review Session at FTB in San Francisco <br /> B. Revise drawings and presentation to respond to comments at City Staff Review Session <br /> C. Meet with City Project Manager in Redwood City (same day as workshop) to coordinate <br /> presentation <br /> D. Community Workshop #2 - Present Preliminary Precise Plan Concepts <br /> <br /> 1. Prepare presentation and workshop materials; logistics coordination <br /> 2. Attend, set up, facilitate discussion, record comments <br /> <br /> E. Coordinate with City Staff re: changes to preferred alternative <br /> <br />Task 6. Prepare Preferred Land Use and Urban Design Concepts <br /> <br />Based on City Staff's and the community workshop participants' reaction to the materials and recommendations <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.