My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 BHV Innisfree Ven... (3)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 BHV Innisfree Ven... (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 9:27:49 AM
Creation date
1/6/2004 12:08:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BHV Innisfree Ventures
PROJECT NAME
construction & reimbursement agmt - Garage
RMP File Number
100 bin 24
Date
10/23/2003
MO Ref
RD-03-28 RD-03-32
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />Change Order Requests <br />On Broadway -Garage <br />Redwood City, CA <br />November 8, 2004 <br />COR # Change Order Title Drawings Status <br />1 1 Cast in place concrete walls INCLUDED <br />2 Mud Slab @ Slab on Grade (ELIMINATED) EXCLUDED <br />3 Design Exterior Metal Stud (SHELL ISSUE) EXCLUDED <br />4 Cut off Soldier Beams (NOT REQUIRED) EXCLUDED <br />5 Cement Treat Subtgrade (ELIMINATED) EXCLUDED <br />6 Contaminated Culvert Soil (COR012) EXCLUDED <br />7 Flourescent Fixtures (REJECTED) EXCLUDED <br />8 Water treatment -south wells (BY CHEVRON) EXCLUDED <br />9 Glazing & Deluge System INCLUDED <br />10 Survey & photo monitoring INCLUDED <br />11 1 Added Well for Water level INCLUDED <br />12 3 Remove Contaminated Soils INCLUDED <br />13 4 Delay by SBC, MCI & PG&E INCLUDED <br />14 Impact if no tie back agreement (NO ISSUE) EXCLUDED <br />15 2 Costs for Culvert Testing INCLUDED <br />16 2 Pothole for additional testing INCLUDED <br />17 Fire Hose Locations INCLUDED <br />18 Excavation Construction Docs INCLUDED <br />19 2 Winterization -Build access road INCLUDED <br />20 Paystation -Electrical INCLUDED <br />21 3 Underground Obstructions INCLUDED <br />22 Added Piles to Design (COR034) EXCLUDED <br />23 HVAC Modifications INCLUDED <br />24 3 Steel to P-1 Level INCLUDED <br />25 Water Recycling System (NOT REQUIRED) EXCLUDED <br />26 Steel market prices INCLUDED <br />27 Revised depth INCLUDED <br />28 2 Buried Fuel Tank INCLUDED <br />29 2 Winterization - mudcat for rain INCLUDED <br />30 OC Jones Night Shins (NOT DONE) EXCLUDED <br />31 Remove Utility Vaults (UTILITY PROJECT) EXCLUDED <br />32 Construction Drawings INCLUDED <br />33 Striping at Middlefield INCLUDED <br />34 mat slab in lieu of piles INCLUDED <br />35 3 Expansion Joints INCLUDED <br />36 Fireproof @ Beams INCLUDED <br />37 Meter dewatering discharge(COR034) EXCLUDED <br />38 Remob Ferma for Culvert Demo INCLUDED <br />39 3 Added Garage Lighting INCLUDED <br />40 Shoring Design -MAT Slab (COR034) EXCLUDED <br />41 Added Steel Beams at Podium INCLUDED <br />42 Slab on Grade Concrete Mix (COR059) EXCLUDED <br />43 Revision to wall types INCLUDED <br />44 SOG & Foundation Mix (COR059) EXCLUDED <br />45 3 Changes to Security Cameras INCLUDED <br />46 3 Cashier's Exchange Window INCLUDED <br />47 Added Doors, Frames & Hdwe INCLUDED <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.