Exhibit "A" <br />Change Order Requests <br />On Broadway -Garage <br />Redwood City, CA <br />November 8, 2004 <br />COR # Change Order Title Drawings Status <br />48 Millwork at Office (NOT DONE) INCLUDED <br />49 WINTERIZATION -Post 3-3-04 (NONE) EXCLUDED <br />50 2 Extended Dewatering INCLUDED <br />51 3 Handle Excess Water INCLUDED <br />52 Soils Stablization INCLUDED <br />53 RFIP0033-Delted Columns($0) INCLUDED <br />54 Dewatering -Filtration overage INCLUDED <br />55 3 Remove Visqueen INCLUDED <br />56 Dewatering coordination INCLUDED <br />57 3 Credit for early Pay INCLUDED <br />58 4 Credit for Builder's Risk INCLUDED <br />59 3 Upgrade Concrete mix INCLUDED <br />60 Sawcut Contraction Joints(NOT DONE) EXCLUDED <br />61 Adjust Schedule of Values (VOID) EXCLUDED <br />62 Added Rebar INCLUDED <br />63 Line 10 structure chage INCLUDED <br />64 3 Waterstop at Construction Joint INCLUDED <br />65 Steel Detail Acceleration (SHELL ISSUE) EXCLUDED <br />66 4 Separate Drainage System INCLUDED <br />67 Added construction joint INCLUDED <br />68 Signage bid overage INCLUDED <br />69 Additional G.C. Resources(COR073) EXCLUDED <br />70 Simplify Hand Rail INCLUDED <br />71 Garage to Shell to Garage INCLUDED <br />72 Off-haul Premium INCLUDED <br />73 General Conditions INCLUDED <br />74 Conduit to City Hall & Lot 2 INCLUDED <br />75 Shell Allocated Costs Wentz/BHV Agr. ONLY <br />76 4 Added SGH visit for walls INCLUDED <br />77 Transformer Room Reconfigure INCLUDED <br />78 Bulletin #1 drawings INCLUDED <br />79 4 RFI #99 -Pilaster at HH-X1 INCLUDED <br />80 4 Document Reproduction Cost INCLUDED <br />81 Pilaster Tops (BFI's 101 & 103) INCLUDED <br />82 Security Camera Purchase INCLUDED <br />83 Shell VE Bulletin #l (9-17-04) INCLUDED <br />84 Additional document reproduction cost INCLUDED <br />85 Reduced Underground Utility Scope INCLUDED <br />86 Adjusted Contractor/Owner Agreement Wentz/BHV Agr. ONLY <br />2 of 2 <br />