My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 BHV Innisfree Ven... (3)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 BHV Innisfree Ven... (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 9:27:49 AM
Creation date
1/6/2004 12:08:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BHV Innisfree Ventures
PROJECT NAME
construction & reimbursement agmt - Garage
RMP File Number
100 bin 24
Date
10/23/2003
MO Ref
RD-03-28 RD-03-32
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />Change Order Requests <br />On Broadway -Garage <br />Redwood City, CA <br />November 8, 2004 <br />COR # Change Order Title Drawings Status <br />48 Millwork at Office (NOT DONE) INCLUDED <br />49 WINTERIZATION -Post 3-3-04 (NONE) EXCLUDED <br />50 2 Extended Dewatering INCLUDED <br />51 3 Handle Excess Water INCLUDED <br />52 Soils Stablization INCLUDED <br />53 RFIP0033-Delted Columns($0) INCLUDED <br />54 Dewatering -Filtration overage INCLUDED <br />55 3 Remove Visqueen INCLUDED <br />56 Dewatering coordination INCLUDED <br />57 3 Credit for early Pay INCLUDED <br />58 4 Credit for Builder's Risk INCLUDED <br />59 3 Upgrade Concrete mix INCLUDED <br />60 Sawcut Contraction Joints(NOT DONE) EXCLUDED <br />61 Adjust Schedule of Values (VOID) EXCLUDED <br />62 Added Rebar INCLUDED <br />63 Line 10 structure chage INCLUDED <br />64 3 Waterstop at Construction Joint INCLUDED <br />65 Steel Detail Acceleration (SHELL ISSUE) EXCLUDED <br />66 4 Separate Drainage System INCLUDED <br />67 Added construction joint INCLUDED <br />68 Signage bid overage INCLUDED <br />69 Additional G.C. Resources(COR073) EXCLUDED <br />70 Simplify Hand Rail INCLUDED <br />71 Garage to Shell to Garage INCLUDED <br />72 Off-haul Premium INCLUDED <br />73 General Conditions INCLUDED <br />74 Conduit to City Hall & Lot 2 INCLUDED <br />75 Shell Allocated Costs Wentz/BHV Agr. ONLY <br />76 4 Added SGH visit for walls INCLUDED <br />77 Transformer Room Reconfigure INCLUDED <br />78 Bulletin #1 drawings INCLUDED <br />79 4 RFI #99 -Pilaster at HH-X1 INCLUDED <br />80 4 Document Reproduction Cost INCLUDED <br />81 Pilaster Tops (BFI's 101 & 103) INCLUDED <br />82 Security Camera Purchase INCLUDED <br />83 Shell VE Bulletin #l (9-17-04) INCLUDED <br />84 Additional document reproduction cost INCLUDED <br />85 Reduced Underground Utility Scope INCLUDED <br />86 Adjusted Contractor/Owner Agreement Wentz/BHV Agr. ONLY <br />2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.