My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Xylem Water Solutions USA, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Xylem Water Solutions USA, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2012 10:01:47 AM
Creation date
11/15/2012 10:01:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Xylem Water Solutions USA, Inc.
PROJECT NAME
Preventative maintenance once a year for 5 years of 62 sewage pumps
RMP File Number
304
Date
11/8/2012
MO Ref
12-199
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Test of pump operation cycle (if level of liquid in station permits). <br /> Check operating of valves and pipes in station. <br /> 4. Repairs such as replacement and installation of O-rings and other minor parts that <br /> determined to need replacing during such inspection. The cost of all such "minor <br /> parts" is included in the contract price and shall not be an extra charge. All parts <br /> considered "minor parts" and the prices used to calculate the contract prices are set <br /> forth in Exhibit B. These repairs do not include overhaul or shop repairs. <br /> 5. A complete written report of the findings, result and work performed on each pump <br /> upon completion of each annual inspection. <br /> PART B - UNANTICIPATED MAJOR REPAIRS <br /> Contractor shall provide any additional pump repairs, overhauls, or direct replacement of <br /> pumps which are not included in Preventative Maintenance. Prior to performing any such <br /> additional repairs or replacements, Contractor shall submit to City a description of the <br /> work determined to be necessary together with an estimate of cost for such work and <br /> parts and obtain written approval from City. The parties shall both execute a written <br /> change order to this Contract, documenting the City's approval and the Contractor's price <br /> and scope of work. Contractor shall perform such additional work and provide necessary <br /> parts at the prices listed in Exhibit B. <br /> CITY ASSISTANCE <br /> At the time scheduled with City, by Contractor to perform inspections and repairs, City <br /> shall provide onsite, 120 volt electric supply, a mechanic to assist in the inspection and to <br /> learn proper repair techniques and if requested by Contractor sufficiently prior to such <br /> inspection, lifting equipment due to the location or size of the pump(s). <br /> PUMPS SUBJECT TO THIS AGREEMENT <br /> REDIN�C7D SWORES STATIONS ` � PUMPlM1�EF� INFORMATION - <br /> STATION #1 <br /> 3152.091 FLS/MINICAS IN USE SN#0380024 460 3 20 HP 436 <br /> 3152.091 FLS/MINICAS IN USE SN#0380025 460 3 20 HP 436 <br /> STATION #2 <br /> 3152.091 FLS/MINICAS IN USE SN#9770057 230 3 20 HP 454 <br /> 3152.091 FLS/MINICAS IN USE SN#0080009 230 3 20 HP 454 <br /> STATION #3 <br /> 3170.090 FLS/MINICAS IN USE SN#0380005 230 3 30 HP 442 <br /> 3171.091 FLS/MINICAS IN USE SN# 0380005 230 3 30 HP 442 <br /> STATION #4 <br /> ATTY/AGR/2012.165/GENERAL SERVICES AGREEMENT XYLEM <br /> REV: 10-05-12 JS <br /> Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.