EXHIBIT "A" <br />SCOPE OF SERVICES AND TIME SCHEDULE <br />PROJECT DESCRIPTION: <br />The City of Redwood City is in need of a new storage tank and pump station at the California <br />Way Water Station. The new California Water Tank will provide operational, emergency, and fire <br />storage for the California Pressure Zone and indirectly to the Wilmington North and Easter Bowl <br />Pressure Zones. The tank will have two (2) inlet supply lines. The primary feed will be from a <br />new 12 -inch pipeline from the Lakeview Pump Station and a secondary supply will be from the <br />16 -inch High -Line fed by the Glenloch Pump Station. The tank outlet will gravity feed the <br />California Pressure Zone and will also provide the suction supply to the new California Pump <br />Station. The California Pump Station will replace an aging outdoor facility with a new pump <br />station enclosed in a building. <br />SCOPE OF SERVICES: <br />The California Water Tank and Pump Station Project shall consist of the following primary <br />elements: <br />• Design for a new water tank, exact size to be determined but will be within the 0.75 to <br />1.0 million gallon (mg) range. Tank shall be constructed of either steel, prestressed <br />concrete, or conventionally reinforced concrete. <br />• Design for anew water pump station to pump from the new California tank to the Easter <br />Cross or Easter Bowl zones. <br />• Design for anew pump station discharge pipeline from the new California Pump Station <br />to connect to existing pi ping adjacent to the Easter Bowl tank. <br />TASK 1 — PROJECT MANAGEMENT <br />Consultant shall provide overall proj ect management for the project. This task shall consist of <br />the following: <br />1. Provide project coordination, communication with the City, development of the <br />project work plan; preparing a project design schedule as well as monitoring and <br />updating that schedule; tracking and reporting job progress on a monthly basis. <br />2. Perform Quality Assurance and Quality Control reviews of the design at each <br />project milestone. <br />3. Perform a constructability review at the 65% and 100% design milestones. <br />4. Consultant shall attend six (6) meetings; project kick-off meeting; <br />Preliminary Design review meeting (30%); 65% Design review meeting; <br />100% Final Design review meeting; pre-bid meeting; and pre -construction <br />meeting. <br />TASK 2 — SURVEYING AND SUPPLEMENTAL UTILITY RESEARCH <br />The City has completed the topographic base mapping for the project to include the proposed <br />tank and pump station site as well as the discharge pipeline alignment. The survey map and <br />digital files (in AutoCAD format) will be provided to the Consultant for review and use during <br />the project. Consultant shall perform utility research and review the City's provided utility <br />mapping and recommend modifications, if any. Consultant shall augment utility information <br />based on available record information from the City and private utility companies as well as <br />conduct a field visit to observe existing structures, trees, and topographic features and <br />evaluate their location on the existing map and make minor adjustments if needed based on <br />what is observable in the field. Consultant shall bring to the City's attention any significant <br />discrepancies in the survey map if and when identified. <br />ATTY/AGR/2012.170/DSA INFRASTRUCTURE ENGINEERING CORP <br />REV: 10-17-12 VR <br />Page 10 of 17 <br />