Laserfiche WebLink
Consultant shall implement a methodical and detailed utility research standard procedure to <br />obtain information from agencies that have utilities in the project area. This research program <br />shall be implemented for each design project, beginning upon receipt of the Contract and <br />continuing through completion of the final design. Consultant shall perform a "supplemental" <br />utility research program for each design project that includes: <br />• Upon authorization by the City, Consultant shall immediately contact USA Dig -Alert to <br />obtain a pre -planning request which provides a listing of existing utility agencies within <br />the project area. <br />• Consultant shall establish one point of contact within its organization that will serve as <br />"Project Utility Coordinator". This individual shall be responsible for tracking and <br />documenting utility requests and responses throughout the project. <br />• From the pre -planning list provided by USA Dig -Alert, Consultant shall contact utility <br />agencies in or around the proposed work area to establish contact information and lines <br />of communication. <br />• Consultant shall mail via Certified Mail -Return Receipt Requested each utility agency a <br />"Utility Notice of Planned Improvements" to formally request their system maps and <br />record drawings. The first request may be general in nature and shall include a <br />preliminary alignment and facility location. <br />• Upon receipt of utility information, the Consultant's Project Utility Coordinator shall <br />review it for completeness and responsiveness to the request. Follow up phone calls or <br />in-person visits to agencies shall be performed as necessary. <br />• Utilities shall be plotted (if not already plotted on the City -provided survey), followed by <br />proposed facilities. Each agency within the pre -planning request area shall be sent a <br />set of plans for conflict check at each submittal milestone. <br />• Consultant shall document and track this process at each step. Consultant shall send <br />agencies plans at each milestone regardless of whether or not there are conflicts, or <br />conflicts have been resolved, due to potential changes that may occur to existing <br />utilities, agency review personnel, and changes to the proposed plans. <br />If existing utilities are in question following review of the field survey and supplemental utility <br />research, Consultant may recommend potholing, subject to the City's approval, to confirm the <br />location and depth of the utilities. Potholing shall be an optional task and appears at the end <br />of this Scope of Services. <br />TASK 3 — PRELIMINARY DESIGN (30% DESIGN SUBMITTAL) <br />Consultant shall prepare a preliminary design layout and technical memorandum that is suitable <br />as the basis for the development of the plans and specif ications. The subtasks shall consist of <br />the following: <br />1. Review the existing water distribution system and pump station functional <br />status. Conduct a meeting with City Public Works Services and <br />Engineering staff and perform a site visit to observe the existing piping, <br />valves, meters, electrical, SCADA system, and downstream PRV to <br />develop a full understanding regarding the use of the California Pump <br />Station. <br />2. Review and verify the hydraulic analysis of the existing system prepared <br />by West Yost Associates to confirm proposed design criteria, functions, <br />and goals. Review the current configuration and operation of the pump <br />station, including downstream and upstream connections and service <br />areas, and provide additional recommendations to improve the system. <br />Incorporate criteria, recommendations and findings into the proposed <br />design. Review the existing Pacific Gas & Electric (PG&E) electricity <br />ATTY/AGR/2012.170/DSA INFRASTRUCTURE ENGINEERING CORP <br />REV: 10-17-12 VR <br />Page 11 of 17 <br />