PROJECT NAME
Design service for California Potable Water Tank, Pump Station and Pipeline Project
RMP File Number
304
Date
11/13/2012
MO Ref
12-206, 17-157
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
operators to respond with the status of their facilities may result in delays to the schedule that <br />is outside of Consultant's control. <br />• Drumming, testing and off-site disposal of drill spoils are not in the scope of work. <br />• This scope of services specifically excludes the assessment of environmental characteristics at <br />the site, particularly those involving hazardous substances beyond naturally occurring levels. If <br />obviously impacted materials are encountered during our geotechnical exploration, <br />Consultant will discontinue its work and provide notice of the condition encountered. <br />Consultant will proceed with its geotechnical scope of work once the parties mutually agree to <br />do so. Added costs incurred because of suspected hazardous substances will be charged on a <br />time -and -expense basis in addition to the fee for the site investigation with the consent of the <br />City Engineer. <br />• The owner will provide site access/permission to enter at the time of scheduled drilling. <br />• The site is accessible to track -mounted drill rig equipment. <br />• Some disturbance to the ground surface and vegetation may occur because of accessing the <br />desired locations of subsurface exploration. Although Consultant will be careful to limit the <br />extent of such occurrences, they cannot be avoided and this scope of services does not <br />include any costs to re -grade, re -vegetate, landscape or otherwise repair disturbed areas. <br />• The scope of work excludes any investigation, analysis, or reporting on any associated parts of <br />the project (e.g. pipelines, etc.) not discussed in this scope of services. <br />• Site specific seismic analysis, the development of site specific spectra, or the production of <br />scaled ground motions are not a part of the scope of work. <br />• Geotechnical observation and testing during construction are not part of the scope of work. A <br />scope of work for these services can be provided upon request once final design plans and/or <br />a detailed project schedule are available. <br />TASK 12 — ENVIRONMENTAL SERVICES (IEC) <br />• Final EIR Review and Coordination — liaison between environmental services subconsultants <br />and the City for the following activities: <br />o Biological Consultation <br />o Cultural Consultation <br />o Asbestos Consultation <br />• Prepare 100% technical specifications addressing the requirements of the Project EIR MMRP <br />and additional environmental technical studies noted in Tasks 13 and 14. <br />• Prepare and submit a City Tree Permit. <br />• Landscape Plan Coordination — review the landscape plans for conformance with the <br />environmental requirements of the Project EIR. <br />TASK 13 — ENVIRONMENTAL SERVICES (MIG) <br />MIG will provide the following services for pre -construction biological surveys to comply with <br />measures BIO -1, BIO -2, BIO -3, and part of BIO -6 of the Mitigation Monitoring and Reporting Program <br />(MMRP) for the Project. The MMRP, prepared pursuant to CEQA guidelines, requires pre -construction <br />biological surveys for nesting birds, roosting bats, and San Francisco dusky -footed woodrat and <br />requires removal of invasive, non-native plants on the parcel. <br />Subtask 1. Nestin¢ Bird Survev (Measure BIO -1) <br />To comply with Measure BIO -1, MIG we will conduct one survey for nesting raptors and othertree and <br />ground -nesting birds within five days prior to the proposed start of construction related activities, <br />including vegetation grubbing/removal, fence installation, grading, etc. All trees and shrubs within 250 <br />Page 9 of 23 <br />REV: 08-16-17 PR <br />ATTY/AGR.Amendment No. 1/Infrastructure Engineering Corporation - CA Tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.