My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Infrastructure Engineering Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Infrastructure Engineering Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2017 1:30:37 PM
Creation date
11/15/2012 11:31:36 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Infrastructure Engineering Corporation
PROJECT NAME
Design service for California Potable Water Tank, Pump Station and Pipeline Project
RMP File Number
304
Date
11/13/2012
MO Ref
12-206, 17-157
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/AGR.Amendment No. 1/Infrastructure Engineering Corporation - CA Tank <br />FEE ESTIMATE <br />Amendment Request No. 1 <br />Page 16 of 23 <br />REV: 08-16-17 PR <br />Prp/eet <br />En, Specialist En, Speclal3t <br />WaN <br />Task/Pnnclpal <br />Sr. Project <br />Praject <br />Sr. Pmject <br />Engineer/ <br />Errv. Pm/ec[ <br />10-P kct I -p jnY <br />CanstrreNm <br />%acefiW/ <br />Spb[ask <br />Subtask <br />Taal <br />Subtask TasWiubtask Desolptlon <br />Manager <br />Manager <br />Engineer <br />Design, <br />Mana9erl Qi nd. all Copb,l <br />Manager <br />bbor-Hoon <br />bbn, Bort <br />Cast <br />Subeon[rRct <br />Cast <br />Can <br />wAddd ort <br />$245.00 $230.00 <br />$215.00 <br />$180.0 <br />$165,0 <br />$165.00 $152.00 $115.00 <br />$180.00 I <br />S9S.W <br />TASKS WD&C0NSTRUMONSUW1WSERVICES <br />3116% <br />6.1 Deseelop Nd Ust <br />0 <br />$D <br />$0 <br />$0 <br />$o <br />6.2 Pre -Nd Meeting <br />0 <br />$0 <br />SO <br />50 <br />SD <br />6.3 Addendum (1( <br />0 <br />$0 <br />$0 <br />$0 <br />$0 <br />6.4 Pre-Comtruetim Meeting <br />2 <br />2 <br />$am <br />$200 <br />$0 <br />$630 <br />6.5 Review Submittals (Q Ml <br />0 <br />$0 <br />$0 <br />$0 <br />$0 <br />6.6 Review CO Reque (4) <br />0 <br />$0 <br />1 $0 <br />$0 <br />$0 <br />6.7 Revlew RFI'$ (20) <br />0 <br />$o <br />$0 <br />$0 <br />$0 <br />685tartup Assistance <br />0 <br />$0 <br />$0 <br />$0 <br />$0 <br />6.9 Feld Visits <br />0 <br />$0 <br />$0 <br />SO <br />$0 <br />6.10 Record Dra vigs <br />2 <br />16 <br />JS <br />$3,000 <br />5400 <br />$0 <br />$3,4 <br />6.11 Nd/Qgdirualan Support (Balm Tana) <br />0 <br />$0 <br />$o <br />$2,279 <br />$2,2]9 <br />612 Nd /Construction Support (JSP) <br />0 <br />SD <br />$o <br />9178$$1,7M <br />fi.13 N oonstruel Support(Fend) <br />0 <br />$D <br />$0 <br />$3,510 <br />$3,510 <br />Gast Nd/Cmrt abn Support E 0) <br />0 <br />$D <br />% <br />$757 <br />$757 <br />6.15 Nd/Construction SUM=(RFYeager) <br />I <br />0 <br />$0 <br />$0 <br />$315 <br />$325 <br />I <br />TASK7 POTNOUING <br />$0 <br />I 7.1 Potbollag(6) <br />0 <br />I <br />$0 <br />I $o <br />I <br />$o <br />$0 <br />I <br />I <br />TASKS COXCREIETANK DESIGN <br />$24A01 <br />8.1 Tank layout <br />0 <br />$0 <br />I $o <br />$0 <br />$D <br />8.2 Tank Design0 <br />$0 <br />$0 <br />$0 <br />$0 <br />83 ReWse Tank Calmlatlons and Drawings <br />2 <br />2 1 <br />$430 <br />$0 <br />$91 <br />$10,393 I <br />8.4 Retaining Wall Design and Drawings <br />0 <br />$0 <br />$0 <br />$14,010 <br />$14,010 I <br />� <br />I <br />TASKS IAFI\DSCAPE DESIGN SERVICES <br />I <br />f3g,561 <br />9.11asMsmpe Design5ervices-Renderings <br />0 <br />$0 <br />$0 <br />1 $14,313 <br />$14,343 I <br />9.2 Meetings <br />0 I <br />$o <br />$0 <br />I 51997 <br />$1,997 I <br />9.3 Design Submittals <br />2 <br />2 <br />5430 <br />$0 <br />I $11511 <br />$12,971 <br />9.4 Construction Phase Services <br />�I <br />I <br />�I <br />0 <br />$D <br />s0 <br />$5,250 I <br />$5,250 <br />I TASK 10/ OFFSITE MIgLNE <br />I <br />I I I <br />I I <br />I <br />I I <br />$3.3]0 <br />10.l.Plan RevieW(OR-We Pipeline) <br />2 <br />1 16 <br />1 1 1 <br />18 <br />$3,370 <br />$0 <br />$0 <br />$3,370 I <br />I TASK 11 (EOIFLXNI[AL INVESTIGATION <br />I <br />I I I <br />I <br />I <br />$216tl I <br />11.1 Supplemental Geoteebniml Imestlgadon <br />2 <br />I <br />I I I <br />2 <br />$430 <br />$o <br />$17,535 <br />$17,9115 I <br />11.2 Cnreultatioa&plan Review <br />I <br />I I I <br />e <br />$0 <br />$0 <br />$3,675 <br />$3,675 I <br />Page 16 of 23 <br />REV: 08-16-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.