Laserfiche WebLink
ATTY/AGR.Amendment No. 1/Infrastructure Engineering Corporation - CA Tank <br />Task/ <br />Subtask Task/Sulmask Description <br />I TASKI PRIMECTMANAGEMENT <br />I 1.1 UordlnaOoldOommunloatlon <br />I 1.2 Quality Review <br />I 3I a ImttaWlity Review <br />I IAIMeetings <br />I I <br />TASK2 $DRYEYING bImIM PFSFA4IM <br />I Z1 Review Survey Data <br />I 2.2 Supplemental Utility Research <br />I 2.3 Pormat/Replace Base Survey <br />I 2.4 DeyelaP Digital Tank Model <br />I TASKS PRELIMINARY (M) DESM <br />I 3.1 Hydraulic Analysis Review <br />I 3.2 Tank Alternatives Evaluation <br />I 3.3 Pump Station Alternatives Evaluation <br />I 3A Hydraulic Transient Analysis <br />I 3.5 Contrd Rrafegy(M) <br />I 3.6 POFV3 Dmwirgs <br />I 3.7 Ov11 Site Layout - Hillside <br />I 39 Mechanical Layout. Hillside <br />TASK4 I66%DESiGN <br />4.IDviVlA4cheMcal <br />I 43 Arch. &Strutt.- Pump Station (Burks Toma) <br />I 0,3A h.&S uta -Ren kdg (Bu ks Tomal <br />I 4.41DectrlW & Imtrume"lon (15P) <br />1 431SCADA ProgmmmIM(EOCCG) <br />I 4.611yieetln6wRh Oty <br />4J 9Mrl Hal to Co. Dow <br />AB SubmKNlto PG&E <br />1 49 Submittal to Co. San Mateo <br />VMS IFDDLL(1D0%)DESIGN <br />Sally /Mach <br />1 5.2Arch. &Strua. -Pump Ration (Burks Toma) <br />I 5.3 electrical & Instrumentation lisp) <br />SA SCADA Programming (EDCCO) <br />5.9 Corrosion Enginemft (RPYeaga) <br />I 5.6 MeeHngwiM aty <br />I s.] Su"Hal to Ca. DDw <br />I Sal submittal to PG&E <br />1 5.91 submittat to as. San Mateo <br />FEE ESTIMATE <br />Amendment Request No. 1 <br />I <br />I i <br />I <br />I <br />I <br />I I <br />I �I <br />�I I <br />�I I <br />I <br />I I <br />I 4 <br />I I <br />I I <br />I I <br />I <br />I 4 <br />I _ <br />I I <br />I I <br />I I I <br />I I <br />i 6 I <br />I <br />I <br />I I <br />I I <br />I 4 <br />I I <br />I I I <br />I I I <br />Page 15 of 23 <br />REV: 08-16-17 PR <br />I <br />I <br />I <br />I <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />4 I <br />2 <br />2 <br />I x <br />4 <br />2 <br />2 <br />2 <br />0 1 s0 <br />X. Project <br />Pro)ect <br />N. Protect <br />ProlM <br />Em. Protect <br />Env. Specauhn Env. Specialist <br />amstruc ll <br />woN <br />PIp4eStaf� <br />so <br />6 <br />$550 <br />$D <br />Principol <br />MpnoBer <br />Manoper <br />engineer <br />Engineer/ <br />Deslgna <br />Mono9erl <br />ill -Prof I-ProfM <br />ManagerAdMn <br />0 1 so <br />Roped,Roped,SONask <br />so <br />Direct tort <br />Subcontract <br />s0 <br />2 $360 <br />$0 <br />$0,536 <br />o so <br />so <br />fit <br />CooN. 111 CaoMl <br />6o $10,M <br />Support <br />Lobo -Hous <br />labor Cost <br />$0 <br />1 $0 <br />$245.00 <br />$230.00 I <br />$215.00 <br />$180.00 <br />5165.00 <br />$165A0 <br />$152.00 $11SAO <br />$180.00 <br />SMLW <br />8 <br />50 <br />1 32 <br />90 <br />$1$646 <br />I <br />$0 <br />$o 1 <br />1 <br />0 <br />so <br />$D <br />so <br />0 <br />$0 <br />$0 <br />$0 <br />I <br />I <br />I <br />I <br />o <br />I <br />so <br />$500 <br />so <br />I <br />I <br />I i <br />I <br />I <br />I <br />I I <br />I �I <br />�I I <br />�I I <br />I <br />I I <br />I 4 <br />I I <br />I I <br />I I <br />I <br />I 4 <br />I _ <br />I I <br />I I <br />I I I <br />I I <br />i 6 I <br />I <br />I <br />I I <br />I I <br />I 4 <br />I I <br />I I I <br />I I I <br />Page 15 of 23 <br />REV: 08-16-17 PR <br />I <br />I <br />I <br />I <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />4 I <br />2 <br />2 <br />I x <br />4 <br />2 <br />2 <br />2 <br />0 1 s0 <br />so <br />I s0 <br />0 1 $0 <br />so <br />I s0 <br />U <br />$2,340 <br />$D <br />so <br />6 <br />$550 <br />$D <br />so <br />0 <br />$0 <br />$0 <br />$D <br />0 1 so <br />s0 <br />$0 <br />0 1 so <br />so <br />so <br />0 1 $2'i <br />so <br />s0 <br />2 $360 <br />$0 <br />$0,536 <br />o so <br />so <br />I so <br />6o $10,M <br />$0 <br />1 so <br />24 $4,080 <br />$0 <br />1 $0 <br />208 <br />$35,452 <br />5400 <br />s0 1 <br />14 <br />$2,470 <br />$0 <br />$%7D5 <br />2 <br />$360 <br />$0 <br />$SS" 1 <br />6 <br />$1,120 <br />$0 <br />$6,081 I <br />0 <br />$0 <br />$o <br />$924 <br />8 <br />51,7m <br />$500 <br />$0 <br />2 <br />$2,896 <br />$200 <br />$0 <br />4 <br />I $555 <br />I $200 <br />$840 <br />18 <br />I $x,896 <br />I I <br />$Lam <br />I <br />SO <br />I <br />166 <br />$31,602 <br />Poll) <br />$D <br />6 <br />$1,020 <br />s0 <br />$12,907 <br />6 <br />$1,020 <br />$0 <br />1 $3,224 <br />2 <br />$130 <br />$0 <br />$3,963 <br />2 <br />I $!30 <br />$0 <br />I $743 <br />e <br />1 $1,700 <br />$500 <br />I so 1 <br />10 <br />1 $4576 <br />$200 <br />I 50 <br />2 <br />$196$100 <br />50 <br />20 <br />I $1,576 <br />$200 <br />I $0 <br />Total <br />Cast <br />$3,330 <br />so <br />$0 <br />$2,340 <br />$990 <br />$19,6 <br />s0 <br />s0 <br />s0 <br />so <br />$4,696 <br />$o <br />$10,080 <br />$4,080 <br />$20,949 <br />$35,852 <br />$12,175 <br />$3,939 <br />$7,201 <br />$924 <br />$2,200 <br />$3,096 <br />$1,496 I <br />53,966 I <br />I <br />s62,a87 I <br />$32,202 <br />513,927 <br />54,294 1 <br />$4,393 I <br />$1,173 I <br />$2,200 <br />$1,776 1 <br />$296 <br />53,776 <br />