Laserfiche WebLink
Task 5.0 Final Report <br /> All of the analyses performed in Tasks 1 through 4 will be developed into a single report for the <br /> City's review. The report will be comprised of the technical memos prepared as part of each <br /> task and will include additional introductory and appendix material as appropriate. Upon <br /> acceptance of the final report CDM Smith team will present the findings and recommendations <br /> to the City Council. <br /> Task 5.0 Deliverables <br /> • Final report <br /> • Presentation to City Council (1) <br /> ATTY/AGR.2012.175/CDM SMITH INC. <br /> REV: 11-1-12 VR <br /> Page 16 of 19 <br />