Laserfiche WebLink
Post-Processing and Finished Product'Storage <br /> <br />Standard procedure will be to break windrows down after 90 days of active <br />composting, and move the windrow into a larger "curing" pile. This cudng-pile <br />reduces microbial activity and allows the pile to cool and stabilize. The site is <br />designed to handle a 90 day storage pedod for all material. <br />Compost post-proceSsing will be dictated by the markets the product is being <br />shipped to. OMCF will have the capability to blend and size the finished compost <br />to meet customer specifications. These products are described in the product <br />marketing section. All matedal distributed to the JPA cities will be tested to meet <br />Federal and State parameters for use as compost soil amendment. Analysis will be <br />completed by a certified laboratory or a laboratory mutually agreed upon by the JPA <br />cities and BFI, and will be tested using standard EPA and ASTM methods. <br />Processing Equipment and Rolling Stock <br />The following lists the equipment type, model number, and intended use for each <br />)iece of ec uipment that will be utilized at the Ox Mountain Compost Facility. <br /> <br /> QTY EQUIPMENT DESCRIPTION PURPOSE UNIT/COST <br /> <br /> 1 Scarab 718HYD Windrow Turner to aerate windrows $160,000 <br /> 1 CBI Gdzzly Rotary Hog gdnd green waste $400,000 <br /> 2 Royer 616 Trommel Screen post-processing $150,000 <br /> 3 Powerscreen Radial Stacking stack product $40,000 <br /> Converter <br /> 1 Caterpillar 950 Wheel Loader load green waste $190,000 <br /> 1 Caterpillar 950 Wheel Loader load compost $190,000 <br /> 1' Caterpillar Water Truck dust mitigation $50,000 <br /> 1 Used Haul Trk Roll-Off Truck transport compost $50,000 <br /> 1 Ptarmigan 20' Picking Conveyor remove $30,000 <br /> contaminants <br /> 3 Roll-Off Boxes 3-40 cu/yds transport on site <br /> contaminants <br /> <br /> <br />