My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 E2 Consulting Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 E2 Consulting Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2012 2:34:32 PM
Creation date
12/5/2012 2:34:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
E2 Consulting Engineers, Inc.
PROJECT NAME
Install and monitor 6 flow meters in wastewater collection system.
RMP File Number
304.5
Date
12/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES AND TIME SCHEDULE <br /> SCOPE OF SERVICES: <br /> Task 1 - Pre-Monitorinq Inspection <br /> Consultant shall install six meters during the wet weather season for finro months pending rain <br /> with an optional month. The City has identified six (6) potential flow monitoring locations which <br /> Consultant shall inspect for hydraulic suitability. Consultant shall take pictures, videos, <br /> measurements, draw sketches and make notes of each potential site. If an initial location is <br /> determined to be unsuitable, Consultant shall recommend alternate locations and/or alternative <br /> equipment. Consultant shall also identify the rain gauge site when locating flow monitoring sites. <br /> Consultant shall submit all potential flow monitoring and rain gauge locations to the City for <br /> approval. All information collected for each location shall be as required for the Task 5 report. <br /> Task 2 - Flow Monitorinq <br /> Flow monitors shall be placed in manholes approved by City. Consultant shall furnish, install, <br /> maintain and remove all flow monitoring equipment. Flow metering equipment shall be the area <br /> velocity type for open channel flow. Consultant shall select a suitable meter after reviewing <br /> specific site conditions. The length of the flow monitoring period shall be as requested by the <br /> City. Open channel flow monitors shall be capable of ineasuring both depth and velocity. Each <br /> monitor shall include data storage capabilities with the capability for one minute intervals. <br /> Consultant shall be responsible for providing all equipment. After completion of monitoring and <br /> data collection services, Consultant shall be responsible for removing flow monitoring <br /> equipment. <br /> Task 3— Rainfall Monitorinq <br /> Consultant shall install one (1) continuous recording rain gauge that shall be used throughout <br /> the monitoring period. Consultant shall provide this equipment and will maintain it once per <br /> week throughout the duration of the project. Loggers, one-channel event recorders, and tipping <br /> bucket rain gauges shall be used. These units shall be accurate to within 0.01 inches. The <br /> clocks in the memory units shall be synchronized with the flow meter digital clocks to provide for <br /> accurate RDI analysis. Consultant shall remove the rainfall monitoring equipment at the end of <br /> the monitoring period. <br /> Task 4—Weeklv Maintenance <br /> Each monitor shall be visited at least once a week for calibration, data retrieval, review, and <br /> maintenance. Flow monitors shall be replaced and/or relocated in the event they are not <br /> performing properly. Consultant shall maintain records documenting calibration and <br /> maintenance, as required for the Task V report. Calibration values shall be taken alternately <br /> between low and high flow periods of the day. All calibration data shall be submitted with the <br /> report. <br /> ATTY/AGR/2012.187/E2 Consulting Engineers, Inc <br /> 11-21-12 VR <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.