Task 5 - Data Reportina <br /> Flow monitoring shall measure the magnitude and components of flow that enter into the <br /> wastewater collection system. Wastewater flow shall be reported as comprised of the following <br /> components: <br /> • Sanitary Flow (SF) —Sewage from residential, commercial, and industrial sources. <br /> • Infiltration/Inflow(I/I)—Groundwater infiltration (GWI) and rainfall dependent <br /> infiltration/inflow (RDI/I). GWI occurs when the groundwater table is above the sewer <br /> pipe and there are openings in the pipe walls or joints. RDI/I enters the system from <br /> direct connections to catch basins and through pipe and joints during and shortly after a <br /> rain event. <br /> Dry weather flow (DWF) periods contain only SF and GWI. Wet weather flow (WWF) periods <br /> include RDI/I in addition to DWF. The relative percentage contributed by each component of <br /> DWF and WWF will vary from one area to another and within a given area as social, <br /> environmental, and physical conditions change over time. <br /> Consultant shall report data, as requested by District. At the completion of the initial flow <br /> monitoring period of ten (10) days, Consultant shall prepare a preliminary report compiling all <br /> data collected after the first ten (10) days of installation. At the completion of the project <br /> Consultant shall prepare a final draft report on all the data collected that season. If ineters are to <br /> be installed at new sites the following year, Consultant shall prepare an additional ten (10) day <br /> report and a final draft report. <br /> Consultant shall present the flow data in the form of seven-day flow charts for each monitoring <br /> station with summary tables of peak, average, and minimum flow, along with the associated <br /> rainfall data. In addition, flow data and rainfall data shall be reported in hourly-averaged <br /> intervals. Data reporting shall also include a base flow hydrograph and a RDI/I separation, <br /> (rainfall dependent infiltration/inflow) (RDI/I). The RDI shall be determined by subtracting the wet <br /> flow from the base flow. Groundwater infiltration (GWI) shall be determined by the average flow <br /> in the wet weeks compared to the dry weeks. The quantity of RDI/I determined from the <br /> subtraction shall be assumed to be the amount of rainfall that entered the sanitary sewer <br /> system. This value shall be expressed as a return ratio, R, expressed as a percentage. The <br /> value of R shall be used to measure how the sewer basin responds to a rainfall event. <br /> Task 6 - Proiect Manaaement <br /> Consultant's Project Manager shall manage project team efforts to achieve satisfactory <br /> completion of the scope of services within budget and on schedule. <br /> Consultant shall obtain the necessary permits whenever required for any of the tasks, maintain <br /> a corporate Health and Safety and Confined Space Plan, and comply with the California <br /> MUTCD manual in matters concerning traffic safety. <br /> ConsultanYs Project Manager shall attend District meetings as required for completion of the <br /> work. <br /> ATTY/AGR/2012.187/E2 Consulting Engineers, Inc <br /> 11-21-12 VR <br /> 11 <br />