My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 55 <br /> Redwood City Chapter 4.Environmental Impact Analysis <br /> d. Conflict with adopted policies,plans,or ❑ ❑ ❑ � <br /> programs regarding public transit,bicycle,or <br /> pedestrian facilities,or otherwise decrease <br /> the performance or safety of such facilities? <br /> Traffic, Circulation and Access <br /> The transportation and traffic impacts related to the proposed modifications were evaluated based <br /> on the traffic studies prepared by Kittelson&Associates,Inc. (Kittelson&Associates,Inc. 2012a, <br /> 2012b) and the transportation impact analysis contained in the 2007 FEIR and 2007 Addendum No. <br /> 1 for the Redwood City Costco Wholesale and Tire Center.ICF and the City independently reviewed <br /> the information provided by Kittelson&Associates. <br /> Environmental Setting <br /> Roadway System <br /> The roadway system remains the same as described in the 2007 FEIR. <br /> Traffic Conditions <br /> To identify the traffic impacts related to the proposed modifications,existing(2012) traffic <br /> conditions were evaluated for intersections on Middlefield Road adjacent to the project site,which <br /> include the Middlefield Road/Woodside Road intersection,the Middlefield Road/Willow Street <br /> intersection,and the Middlefield Road/Charter Street intersection (study intersections).These three <br /> signalized intersections were identified as having the highest potential to be affected by the <br /> proposed modifications. <br /> Since the adoption of the 2007 FEIR,Costco has moved the project entrance at the Middlefield <br /> Road/Charter Street intersection to the Middlefield Road/Willow Street intersection and <br /> reconfigured and signalized the Middlefield Road/Willow Street intersection.Costco has also <br /> dechannelized Middlefield Road and increased the length of left-turn pocket at the Middlefield <br /> Road/Woodside Road intersection. <br /> Traffic Volumes <br /> Manual intersection traffic volume counts were conducted at the three study intersections for the <br /> weekday PM peak period (4 to 6 p.m.) on May 15,2012 and Saturday midday peak period (11 a.m.to <br /> 3 p.m.) on May 19,2012 while school was still in session;the traffic volume counts account for the <br /> full range of traffic demand experienced in the area under existing conditions. <br /> To provide context,the traffic counts from May 2012 were compared to other traffic counts <br /> collected in the study area over the past 6 years since the initial Costco onsite redevelopment <br /> project was considered.Table 4.3-1 provides a comparison of traffic volumes on Middlefield Road <br /> between 2006 and 2012. <br /> Addendum No.2 to the Environmental Impact Report for 4-10 September 2012 <br /> the Redwood City Costco Wholesale Project ICF 00154.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.