Laserfiche WebLink
6.1.C. - Page 3 <br /> this project will be funded through budget transfer from Sewer Fund Capital Projects — <br /> Collection System Replacement Program. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that the 2011-2012 Sanitary <br /> Sewer Rehabilitation Project meets the California Environmental Quality Act (CEQA) <br /> exemption criteria as set forth in Section 15301 (Existing Facilities) and Section 15302 <br /> (Replacement or Reconstruction) of the CEQA Regulations. Furthermore, this project <br /> has been designed compliant with the city's Engineering Standards and accepted <br /> practices. <br /> This project does not require a National Pollutant Discharge Elimination System <br /> (NPDES) General Permit for stormwater discharges associated with construction and <br /> land disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br /> exempts projects to update existing lines and facilities. However, the proposed <br /> construction will employ stormwater pollution prevention best methods and practices. <br /> t <br /> --�, <br /> JIMMY TAN, P.E. <br /> SENIOR CIVIL ENGINEER <br /> G�� <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> �� <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTACHMENTS <br /> 1. Project Location Map <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> 1. Contract Documents <br /> 2. Bid Documents <br />