Laserfiche WebLink
7.A. - Page 12 <br /> In 2012, the City prepared Addendum No. 2 for the current iteration of the development <br /> proposal for Pete's Harbor. The purpose of an Addendum is to describe the changes <br /> and additions to the previously certified EIR necessary to achieve CEQA compliance for <br /> the current proposal. A city shall not prepare another EIR if the analysis demonstrates <br /> that there are no new significant impacts or increases in severity to previously identified <br /> significant impacts. (Pub. Resources Code § 21166; CEQA Guidelines §§ 15162(a); <br /> 15164, see also Addendum No. 2, p. 3-1.) <br /> The Addendum analysis demonstrates that the revised Pete's Harbor Project will not <br /> cause new significant impacts or increases in severity to previously identified significant <br /> impacts. Thus, the City properly relies upon the environmental analysis in the EIR and <br /> the Addenda and does not need to prepare another EIR (e.g., a supplemental or <br /> subsequent EIR). Addendum No. 2 was published for the Planning Commission <br /> meeting. (Addenda do not need to be circulated for public review and comments.) (Pub. <br /> Resources Code § 15164(a).) <br /> Section 2 of Addendum No. 2 (Attachment 4, including Errata Sheets, Attachments 5-7) <br /> describes the specific differences between the current Pete's Harbor Project and the <br /> version analyzed in the EIR. Section 3 of Addendum No. 2 describes how the <br /> differences affect the impact and mitigation conclusions of the EIR. Addendum No. 2 <br /> also identifies mitigation measures that have been removed as a result of the reduced <br /> project scope, mitigation measures that remain applicable, and any new mitigation <br /> measures (as applicable). A summary of the revised impacts and mitigation measures is <br /> included in Table 1.1 of the Addendum, which verifies that the revisions incorporated in <br /> the current Project would not result in new significant environmental effect or a <br /> substantial increase in the severity of the significant effects identified in the certified <br /> EIR. In fact, due to the reduction in the scale of the Project, there are fewer significant <br /> impacts than had been identified in the EIR, for which the Council already adopted a <br /> Statement of Overriding Considerations. (See Addendum No. 2, p. 1-6.) <br /> Approval of the Project <br /> The Project was first reviewed by the Architecture Advisory Committee (AAC), on <br /> September 19, 2012. It recommended approval of the site plan and basic massing, with <br /> recommendations regarding some details, which were incorporated into the Project. <br /> The Planning Commission reviewed the Project on October 16 and 30, 2012. Staff <br /> recommended approval of the Project, citing compliance with multiple General Plan <br /> policies. After considering the environmental review (including the EIR and Addenda <br /> Nos. 1 and 2), the comments from the public and staff, and the merits of the Project, the <br /> Planning Commission approved the PD Permit (including parking modifications <br /> Page 12 of 27 <br />