My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
arrac 7.A. - Page 33 <br /> 8. The applicant shall submit a detailed landscape plan in accordance with <br /> the Pete's Harbor Residential Community Plan, the City's landscaping and <br /> water conservation requirements and guidelines. <br /> Engineering Conditions <br /> 9. Applicant shall contribute its fair share or construct improvements per the <br /> East 101 Infrastructures Fair Share Plan. The City has an Infrastructure <br /> Plan for any development East 101, which establishes fair share mitigation <br /> for public improvements in the project vicinity including roadway <br /> improvements, water and sewer line upgrade, etc. The applicant would be <br /> required to contribute to this program based on the number of equivalent <br /> dwelling units established in the project. <br /> 10. Project must meet fire flow requirements as established by the Fire <br /> Department which are based on the International Fire Code and the <br /> California Fire Code. Fire flow tests are typically performed during the <br /> preliminary design phase but must be completed prior to submittal of final <br /> design. Applicant shall contact the Fire Department for fire flow <br /> requirements, and then submit a written fire flow test request to <br /> Engineering. <br /> 11. Applicant shall be responsible for the installation on the west side of <br /> Highway 101 of any water line connections necessary to meet the <br /> project's fire flow requirements. <br /> 12. Grading shall be performed in accordance with Volume III, Part II of the <br /> City's Engineering Standards (www.redwoodcitv.or�/cds/en�ineerin�/ standards/ <br /> desi�n/Partv). Soil or other construction materials shall not be stockpiled in <br /> the public right-of-way. Applicant shall submit cut/fill volumes (CY) for all <br /> soils to be imported to or exported from the site. <br /> 13. Applicant shall apply for and obtain a Grading Permit. Prior to Grading <br /> Permit issuance, the applicant shall submit a Plot and Finished Grading <br /> Plan prepared by a California registered Civil Engineer. <br /> 14. All utilities shall be designed in accordance with the City's Engineering <br /> Standards. All onsite private utilities shall also be designed to meet City's <br /> Engineering Standards or in accordance to City's design practice. <br /> 15. Applicant shall evaluate and determine the project's impact to the City's <br /> wastewater system. Applicant shall improve sewer mains that are under <br /> capacity, based on the City's Sewer Master Plan, and are impacted by the <br /> project. <br /> ATIY/RE50.2825/PETE'S HARBOR <br /> REV:01-24-13 VR <br /> Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.