My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 199 <br /> City of Redwood City �IH Addendum <br /> October 8, 2012 Page 3-36 <br /> 3.5 BIOLOGICAL RESOURCES <br /> The relationships of the current Pete's Harbor project to the previously certified 2003 EIR <br /> biological resources impact and mitigation conclusions are described below. Habitat types <br /> present on the reduced project site are depicted on Figure 3.5-1. <br /> Impact 8-1 Analysis: Impacts on Steelhead and Chinook Salmon. The 2003 EIR indicated <br /> that the Marina Shores Village project would permanently fill approximately 11.54 acres of <br /> existing estuarine habitat for steelhead and two species of chinook salmon; and also indicated <br /> that project construction activities would temporarily disrupt this habitat. The associated 2003 <br /> EIR mitigation required applicant coordination with the National Oceanic &Atmospheric <br /> Administration (NOAA) Fisheries (referred to in the 2003 EIR as the "National Marine Fisheries <br /> Service") and the California Department of Fish and Game (CDFG) on steelhead and chinook <br /> salmon issues, and formulation of a Habitat Mitigation and Monitoring Plan (HMMP) subject to <br /> the approval of the NOAA Fisheries and CDFG. The 2003 EIR also described several specific <br /> measures likely to be required by these agencies as part of the HMMP. The NOAA Fisheries <br /> and CDFG HMMP approval processes were also detailed in the 2003 EIR. <br /> The current Pete's Harbor project would not fill any existing estuarine habitat. However, the <br /> potential for impacts of construction directly adjacent to estuarine habitat (e.g., water turbidity, <br /> contaminant release, noise) would remain. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 8-1 from the 2003 EIR <br /> have been modified to remove the references to filling and dredging, which would not be <br /> required under the current Pete's Harbor project. The modified mitigation remains sufficient to <br /> reduce this impact to a less-than-significant level. <br /> Impact 8-2 Analysis: Impacts on Essential Fish Habitat. The certified 2003 EIR identified <br /> an impact similar to Impact 8-1 above, in which the project-related loss of existing estuarine <br /> area (and the disruption of the existing estuarine area during project construction) would result <br /> in the permanent loss, and temporary construction period disruption, of essential benthic habitat <br /> for the following federally protected fish: certain species of rockfish, flat fish, sharks, and rays, <br /> the Pacific sardine, the northern anchovy, and other species. The associated 2003 EIR <br /> mitigation was the same as the mitigation for Impact 8-1 above. <br /> The current Pete's Harbor project would not fill any existing estuarine habitat. However, the <br /> potential for impacts of construction directly adjacent to estuarine habitat (e.g., water turbidity, <br /> contaminant release, noise) would remain. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 8-2 from the 2003 EIR <br /> have been modified to remove the references to filling and dredging, which would not be <br /> required under the current Pete's Harbor project. The modified mitigation remains sufficient to <br /> reduce this impact to a less-than-significant level. <br /> Impact 8-3 Analysis: Impacts on the California Clapper Rail. The certified 2003 EIR <br /> indicated that project construction would result in direct long-term loss of an unspecified amount <br /> T:1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.