My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 213 <br /> City of Redwood City Lin r�uuciiuuni <br /> October 8, 2012 Page 3-50 <br /> differential settlement and ground failure/liquefaction. Because the current Pete's Harbor <br /> project proposes fewer residences than the previous Pete's Harbor project component (411 vs. <br /> 633), the potential extent of this impact would be reduced; however, the impact is still <br /> considered potentially significant. <br /> Similar to the mitigation for Impacts 11-1 and 11-2 above, mitigation details for this impact would <br /> be included in the detailed, design-level geotechnical investigations required for both the <br /> previous project and the current project, including analyses of the site's seismic stability, <br /> liquefaction potential, and soil response characteristics. <br /> All project construction would be required to comply with the City's most recently adopted <br /> version of the International Building Code with California Amendments. <br /> Conclusion. Modified mitigation. The 2003 EIR mitigation for this impact refers to the 1997 <br /> UBC; the modified mitigation refers to "the City's most recently adopted International Building <br /> Code with California Amendments," which would be applied to the current project; otherwise, <br /> the mitigation identified in the 2003 EIR for Impact 11-3 remains applicable to the current Pete's <br /> Harbor project and remains sufficient to reduce this impact to a less-than-significant level. <br /> Since the 2003 EIR was certified, the majority of Redwood City, including the project site, has <br /> been identified as in a Seismic Hazard Zone prone to liquefaction.' Therefore, the geotechnical <br /> report will also have to address liquefaction, per State Department of Mines and Geology (DMG) <br /> Special Publication 117, "Guidelines for Evaluating and Mitigating Seismic Hazards in <br /> California." <br /> Impact 11-4 Analysis: Encountering Groundwater in Bay Mud During Excavation. The <br /> 2003 EIR concluded that excavation for the proposed project's below-grade installations, such <br /> as utilities, could encounter groundwater. This condition continues to apply to the current Pete's <br /> Harbor project. <br /> Similar to the mitigation for Impacts 11-1 through 11-3 above, mitigation details for this impact <br /> would be included in the detailed, design-level geotechnical investigations required for both the <br /> previous project and the current project, including analyses of the project's proposed dewatering <br /> techniques, slope and shoring requirements for excavations, buffer zones for construction <br /> equipment near slope edges, the potential for requiring light grading equipment, subgrade <br /> remediation techniques, and the use of excavated fill. <br /> Conclusion. No change. The mitigation identified in the 2003 EIR for Impact 11-4 remains <br /> applicable to the current Pete's Harbor project and remains sufficient to reduce this impact to a <br /> less-than-significant level. <br /> Impact 11-5 Analysis: Corrosive Soils. In the 2003 EIR, the on-site soil was classified as <br /> "severely corrosive," with potential to result in long-term damage to project building foundations <br /> and underground utility systems. This condition continues to apply to the current Pete's Harbor <br /> p roj ect. <br /> Similar to the 2003 EIR mitigation for Impacts 11-1 through 11-4 above, mitigation details for <br /> Impact 11-5 would be included in the detailed, design-level geotechnical investigations required <br /> 'State of California Seismic Hazards Zones map, Palo Alto Quadrangle; Department of Conservation, <br /> October 18, 2006. <br /> T:1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.