My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 212 Pete's Harbor <br /> c;ity ot Hedwood C:ity EIR Addendum <br /> October 8,2012 Page 3-49 <br /> 3.8 SOILS AND GEOLOGY <br /> The relationships of the current Pete's Harbor project to the previously certified 2003 EIR soils <br /> and geology impact and mitigation conclusions are described below. <br /> Impact 11-1 Analysis: Geotechnical Hazards Associated with Project Grading. The <br /> certified 2003 EIR concluded that, based on the applicant's preliminary geotechnical <br /> investigation, the interaction of existing geotechnical conditions with the project proposed <br /> grading, dredging, and surface modifications could result in significant geotechnical impacts <br /> associated with surface settlement, seismic hazards, and/or soil erosion. <br /> The associated 2003 EIR mitigation required the project applicant to have detailed, design-level <br /> geotechnical investigations professionally prepared for each project structure. Topics <br /> addressed in the investigations would include, among others, strength parameters for <br /> foundation design, perimeter slope stability, soil corrosivity potential, and characteristics of the <br /> underlying Bay mud. All geotechnical recommendations resulting from the investigations would <br /> be subject to review and approval by an independent engineering geologist or geotechnical <br /> engineer retained by the City Engineer at applicant expense. <br /> The current Pete's Harbor project, although smaller, would still result in similar potentially <br /> significant geotechnical hazards associated with project grading and surface modifications (the <br /> current project would not include dredging). <br /> Conclusion. Modified impact and mitigation. References to dredging have been removed from <br /> the impact and mitigation because the current project would not involve dredging. Otherwise, <br /> the mitigation identified in the 2003 EIR for Impact 11-1 remains applicable to the current Pete's <br /> Harbor project and remains sufficient to reduce this impact to a less-than-significant level. <br /> Impact 11-2 Analysis: Total and Differential Settlement. The project site is located atop <br /> weak, compressible Bay mud. Both the previous project and the current project would introduce <br /> structural loads too great to be supported on conventional shallow foundations over Bay mud, <br /> potentially resulting in excessive total and differential settlements. Associated mitigation details, <br /> involving common engineered solutions for such projects atop Bay mud, would be included in <br /> the detailed, design-level geotechnical investigations required for both the previous project and <br /> the current project (see Impact 11-1 above), including analyses of all fill material. <br /> The previous Marina Shores Village project would require building foundations supported on <br /> piles driven approximately 95 feet or greater in depth (based on the depth to bedrock). <br /> However, the applicant has concluded that any piles required for the current Pete's Harbor <br /> project would be auger cast and not driven. <br /> Conclusion. Modified impact and mitigation. References to dredging, pile driving (auger cast <br /> piles could be necessary), and reconfigured marinas have been removed from the impact and <br /> mitigation because the current project would not involve these activities. Otherwise, the <br /> mitigation identified in the 2003 EIR for Impact 11-2 remains applicable to the current Pete's <br /> Harbor project and remains sufficient to reduce this impact to a less-than-significant level. <br /> Impact 11-3 Analysis: Ground Shaking/Liquefaction. Both the previous project and the <br /> current project would place new residences in a subregion that is expected to experience <br /> severe earthquake-induced ground shaking during the life of the project, potentially resulting in <br /> T:1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.