My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 217 <br /> City of Redwood City Ei�Addendum <br /> October 8,2012 Page 3-54 <br /> project would be reduced compared to the 2003 project, project demolition and construction <br /> noise impacts would remain potentially significant. <br /> Mitigation 13-3 in the 2003 EIR included construction-period noise abatement procedures, <br /> including among others: (1) preparation of a detailed construction plan, (2) designation of a <br /> noise disturbance coordinator, (3) restrictions on construction hours, (4) construction of noise- <br /> shielding barriers, and (5) designation of construction traffic routes. <br /> The 2003 EIR concluded that implementation of these measures would substantially reduce <br /> project construction period noise impacts, but occasional exceedances of City noise standards <br /> (60 dBA Ld�) at nearby residential areas may still occur and, as a result, this impact would be <br /> significant and unavoidable. <br /> Conclusion. Modified impact and mitigation. Because pile driving would be replaced with <br /> auger cast pile installation, Mitigation 13-3 has been modified accordingly. Subsequent to City <br /> certification of the 2003 Marina Shores Village Project EIR, the City has concluded in its various <br /> CEQA documents and findings for other projects that implementation of City-required noise <br /> abatement procedures would reduce short-term, intermittent construction-period noise impacts <br /> to a less-than-significant level. This conclusion also applies to the Pete's Harbor project. <br /> Other Impacts. The 2003 EIR determined that the previous Marina Shores Village project <br /> would have less-than-significant impacts resulting from project-generated off-site traffic noise, <br /> ambient aircraft noise exposure, and cumulative noise conditions. The current Pete's Harbor <br /> project includes no components or new conditions that would change these conclusions. <br /> T:1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.