My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 218 Pete's Harbor <br /> �.ny�i neuw��u�.ny EIR Addendum <br /> October 8,2012 Page 3-55 <br /> 3.11 CULTURAL AND HISTORIC RESOURCES <br /> The relationships of the current Pete's Harbor project to the 2003 EIR cultural and historic <br /> resources impact and mitigation conclusions are described below. <br /> Impact 14-1 Analysis: Disturbances of Prehistoric Cultural Resources. The 2003 EIR <br /> indicated that implementation of the project grading plan could disturb as yet unidentified <br /> cultural (archaeological) resources. Although the current Pete's Harbor project encompasses a <br /> reduced project site compared to the previous project, this impact remains potentially significant. <br /> The associated 2003 EIR mitigation required on-site excavation monitoring by an archaeologist <br /> and subsequent protective measures as prescribed by California Historical Resources <br /> Information System (CHRIS), Native American Heritage Commission, CEQA, and the City's <br /> Cultural Resources Management Program. <br /> Conclusion. Modified impact and mitigation. References to dredging and marina excavation <br /> have been removed because these actions would not occur under the current Pete's Harbor <br /> project. Otherwise, Mitigation 14-1 remains applicable to the current Pete's Harbor project and <br /> remains sufficient to reduce this impact to a less-than-significant level. <br /> Other Impacts. The certified 2003 EIR determined that the previous Marina Shores Village <br /> project would have a less-than-significant impact resulting from the disturbance of historic <br /> resources. The current Pete's Harbor project includes no components or new conditions that <br /> would change this conclusion. <br /> T.•1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.