My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 242 <br /> '7. Prior to the issuar�ce of a Building Perrnit, the applicant shall s�cure an <br /> Archi�ectural Permit per Ar�icle 45 of the Redwood City Zorting Qrc�inance. <br /> 8. The applicant shafl submi# a d�tailed landscape pfan in accordance vs+itF� <br /> the Pete's Harbor Reside�tEai Carnrnunity Plan, the City's Eandsca�ing and <br /> wat�r conservatior� raquirements and guideli�es. <br /> Engineering Conditions <br /> 9. Appficant shall contrib�fe its fair shar� ar eonstruct impro��rrients per the <br /> East 101 In�rastructures Fair 5hare Plan. The City has an fnfrastructure <br /> Plan fior any development East 1��, which estabfishes fair sY�are mit�gation <br /> for public improvements i� the project vicinity [ncluding raadway <br /> improvemer�ts, water ar�d sew�r line �pgeade, etc. The applica�t would be <br /> required to confribute to this program based on the number of equivalenf <br /> ciwefling units estabiished in t�e p�oj�ct. <br /> 10. Projecfi must meef fire flow requirements as estabiished by t�e Fire <br /> Department wl�ich are based oh fhe Infernatianal Fire Code and the <br /> Cali�arnia Fire Cod�. Fire flow tests are typically performed during the <br /> pre�iminary design phase but must be comp�ef�d prior to s�bmif�a! of final <br /> design. Applicant shall contact the Fire Department for fire flow <br /> requirements, and then submit a written fre f�ow test request to <br /> Engineering. <br /> �1. App[icant shafl b� res�onsible for the instalfation on fhe west sicfe of <br /> Highway 109 at a�y water line cannections necessary ta meet the <br /> project's fire flow requirements. <br /> 12. Grading shalE be. perFormed in accordance with VoCume Ifl, Part il af �he <br /> Cifiy's �ngineering Star�dards (www.redwoodc� .or cds en ineerin standards <br /> � dPSi�n1Partv). Soil or ot�ef constr�ctian rnaterials shall not be stockpiled in <br /> the public right-of way, App�icant shall submit cutlfli vo�umes (CY) for afl <br /> sails to be impar�ed fio or exported from the site. _ <br /> 13. ApplECar�t shalf apply for and obtain a Grading Permit. Prior #o Grading <br /> Permit issuance, th� applicant shafl submit a Plot and Finished Grading <br /> Plan prepared by a Ca[ifornia registere� Civil Engineer. <br /> 14. A14 �rtili#ies shall be d�signed in accordance wi�h the City's Engineering <br /> Standards. Ail onsite private utilities shall also be desigr�ed to meet City's <br /> Er�gineering Standards or in accordance tv City's design practice. <br /> 1�. Appficant shalE e�aluate and determir�e the project's impacf to the City's <br /> wastewater system. Applicant shall improve sewer mains that are t�nder <br /> capacity, based on the City's Sewer Master Plan, and are impacted by the <br /> project. <br /> ATTY/RE50.2795/PC PETES HAReOR PROJECT <br /> R�/:10-25-12 VR <br /> , Page 5 of IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.