My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 243 <br /> 16. Applicant shall perfarm any and ail sanitary sewer pipe replacement <br /> necessary ta reduce infEow and in�itrafion ar pay an in-li�� f�e, as <br /> defiermined by the Ci#y Engineer. The lengtl� of pipe replac�ment or th� <br /> amounf of f�� wif[ be in accordance with Attachm�nt L of the City's <br /> Engineering Star�dards. <br /> 17. Recycie� water facifity shatE be pro�ided and designed in accordance with <br /> Engineering 5tandards for dual plurnbing, irrigafion and other warrar�ted <br /> uses as rnentioned in the Recyc[ed Water Ordinance. <br /> 18. Prior t� tF�e submittal of construction dacuments, the applicant shaif abtain <br /> a saifs repor�, prepared by a ficensed geotechnicaf engineer, in ' <br /> conformance wifh En�ir�eering Star�dards, Volumes II & flf. <br /> 19. The ap�licanf sha11 pay aIf applica�le wafer, recycled water, ar�d <br /> wastewater, reiateci fees outlined on the City's web si�e at: <br /> htt :l/www.redwoodci .or /fii�nfrasfructure/ df/FeesandChar es01.04.72 <br /> \ ;,.�df, prior to build�ng permit issuar�ce. <br /> 2Q. Pursuant to City Municipaf Code Chapter 18, Ar�ic(e KfV, street, curb, <br /> gutter and sidewalk shaf! be repEaced, repaireci, repa�ed, or reconstructed. <br /> 2'E. The ap�ficant sY�alf instaA undergrour�d utifities as outlined in the Ci�y <br /> Munic�paE Code Chapt�r 18, Article X]V, Local Development 5tandards. <br /> 22. Post-constr�ctian runoff Et1t0 the storm cErain shafl nof exceed pre- <br /> construction runoff le�els. T�e appficant's design prafessional shail <br /> evaluate fhe praject's impact to the City's starm drainage system and shall <br /> subs�antiate t�teir canclusions wi�h drainage caicufatians to �f�e satisfactfan <br /> . af the City Engineer. . <br /> 23. Starmwater Pollution Pre�ent�on f'rogram Best Management Prac�ices <br /> (BMPs) far construction shall be implemented to protect water qualify, in <br /> aceorda�ce with t�t� apprvved Stormwater Pollutian Prevention Plan <br /> (SWPPPj. BMP pfan s�eets are available electronically for insertir�g in�o <br /> project pians. <br /> 24. For construc�ion activity resulfing in a land disturbance of one acre or <br /> more, applicant sha!! fiie a Notice of Intent (NOI) with the State 1Nater <br /> R�sourc�s Contral Board under �he Construction Aeti�it�es 5torm Water <br /> General Permit (Ger�eraf Permif). The N�� indicates #he ap�ficant's intenf <br /> ta comply with tf�e San Matea Countywide Stormwater PoElutian <br /> Prev�nfian Program, including a Stormwater Pofiution Prevention Pfar� <br /> (SWPPP). (wwwscrcb.ca.�qvlstormwtr/construction.htmi). <br /> ATTY/RES0.2795/PC PEfES HARBOit PADlECT <br /> REV:10-25-12 VR <br /> Page 6 af Z5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.