My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 244 <br /> 25. Plans shai! be designed to meet the C3 re�uiremen�s of the Mu�ici�a[ <br /> Regional Permit {MRP) NPDES f'ermit CAS 6120D8, Applicant`s design <br /> professia�tal sha!! complete NPDES Checklisfs, Ai�achmenfis R� and R2 of <br /> the City Standards, �o help d��ermine fhe minimum requfrements fa� the <br /> project site. Req�irements shali be confirmed at fhe time of #he building <br /> permi� issuance. <br /> 26. Appficant shalf comp�ete fihe City's "NPDES Permit Compliance Checkiist", <br /> and provide for permar�ent stormwater control measures select�d from the <br /> City's "Local Saurce Confirol Measures L�isfi", as appropriate. Fnr potential <br /> sol�tions, the applicant may refer to "Start at Source", a Manual developed <br /> by the Bay Area Sformwater Mar�agement Agencies Association by <br /> (BASMMA). <br /> 27. I� construcfior� is na� complete by the star� of the wet season (October 1 <br /> thro�g� April 30), the applicant shall impiemen# a winteriza�ion program to <br /> minimize the potential for erosion and sedimer�tation, As approprfate tn <br /> the site and status of canstructivn, wint�rization re�uiremertts shal! mcfude <br /> inspectinglmaintaininglcleanfng all soif erosion and s�dimentatfon controls <br /> prior to, during; and immediatefy after each s#arrr� event; stabilizing <br /> cfisturbed soils through temporary ar permaner�t seecfing, mulching, <br /> ma#�ing, tarping ar other physicaf ineans; r�cking unpaved �ehicle access . <br /> to fmifi dispersion of much onto public right-of-way; and cover�ng/tarPing <br /> stored construction rnaterials, fuels, and other chemicals. P�ans to inciude <br /> proposed measur�s to prevent erosion and poll�,ted runaff from alE s�te <br /> condifiiorts shall be submii�ed far apprnvaf by CDD prior to beginning <br /> constructior�. As site condRtions warrant, the C�#y Engineer may direct the <br /> appficant ta implement additiona{winterizatian requirements. <br /> �8. Priar to Final Map approval, the ownerlapplicanfi shali enter into a <br /> � Landscape Maintenance Agreement (LMA) for alf assigned [andscape <br /> areas in public rights of way to be mai�tained. Maintenance i�ems shal[ <br /> include planting not iimited to trees, shrubs, flowers, grass, and alf <br /> appurtenances incEuding irrigation systems and pedestrian scale Eighting. <br /> 29. Priar to Fi€�al Map approval, fhe ow�erlappiicant shal! enter i�to a <br /> Stormwater Treatmenfi Measures Maintena�nce Agreem��f for alE on-site <br /> stormwater treatment measures associated �vith th� project. <br /> 30. The ownerlapp[icant shalf pay a Traff[c Mitigafiion Fee based an the <br /> scheduie set by Ordinance. <br /> ATTY/RES0.2795/PC PETES HARBOR PRd1�CT <br /> � REV:1a-25-12 VR <br /> Pag�7 of t5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.