My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Carollo Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Carollo Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 8:22:18 AM
Creation date
2/7/2013 12:52:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Carollo Engineers, Inc.
PROJECT NAME
Design, bid support and construction services for the Bair Island Storm Pump Station
RMP File Number
304
Date
2/7/2013
MO Ref
13-019, 15-187
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES AND TIME SCHEDULE <br /> PROJECT DESCRIPTION: <br /> Design, bid support and construction services for the Bair Island Storm Pump Station <br /> Project <br /> SCOPE OF SERVICES: <br /> TASK 1 —PROJECT MANAGEMENT <br /> This task includes the overall management of the project as follows. <br /> 1. Provide project coordination; com municating project issues with the City; setting up the <br /> project plan, design schedule as well as monitoring and updating the schedule, and <br /> tracking and reporting job progress. <br /> 2. Attend a minimum of six (6) meetings; Project kick-off ineeting; Preliminary Design review <br /> meeting ; 90% Design review meeting; 100% Final Design review meeting; Pre bid meeting <br /> and Pre constructi on meeting <br /> Deliverables: <br /> • Project design schedule <br /> • Monthly progress report <br /> • Meeting agenda and meeting minutes <br /> Assumptions: <br /> • Six Meetings <br /> TASK 2—SURVEYING, UTILITIES RESEARCH and GEOTECHNICAL INVESTIGATION <br /> This phase provides the survey ing and utilities research for the project. This task includes the <br /> following: <br /> 1. KPFF Consulting Engineers has completed the topographic base mapping for the project. <br /> The survey map will be provided to the selected consultant for review and use. The <br /> consultant shall review and clarify utility information based on as-built plans from the City <br /> and private utility companies, and topographic features. Verify features as needed. <br /> 2. If existing utilities are in question after the review, the consultant may, with approval from <br /> the City, contract with a potholing com pany to confirm the location and depth of the utilities <br /> if needed. <br /> 3. The geotechnical investigation for Bair Island Road was completed by Treadwell & Rollo on <br /> November 12, 2008. Consultant shall review the document and incorporate pertinent <br /> information for use in design. <br /> Deliverables: <br /> • Potholing results (if approved by the City) <br /> Assumptions: <br /> • No assumptions at this time <br /> ATTY/AGR/2012.206/CAROLLO FOR$218784 <br /> REV:12-20-12 VR <br /> Page 10 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.