Laserfiche WebLink
LABOR AND COST ESTIMATE—AMENDMENT N0.2 <br /> CITY OF REDWOOD CITY <br /> BAIR ISLAND STORM DRAIN PUMP STATION PROJECT <br /> Other Direct Costs ODC <br /> PM PE MECH STRUC E&IC CAD WP Total Labor SubconsuRants PECE� Milea e�z� ODC Total <br /> Task Descri tion $259 $215 $215 $215 $215 $139 $96 Hours Cost Name Amount $10 Printin Tri s Amount Cost Cost <br /> $0 <br /> 9.0 Design Engineering Support During Construction <br /> 9.1 Review and respond to Additional Submittals,Shop drawings,RFls,Change Ord 10 23 22 7 30 42 0 134 $26,058 $1,340 $0 0 $0 $1,340 $27,398 <br /> 9.2 Hazardous Waste Related CM Issues 4 11 15 $3,401 $150 $150 $3,551 <br /> Task 9.0 Totals 74 34 22 T 30 42 0 749 Sz9,459 $1,490 SO $0 EO 51,490 $30,949 <br /> 10.0 Additional Post Construction Services <br /> 10.1 Inspection and consufting during one year warranty period 4 0 6 6 16 $3,616 $160 $160 $3,776 <br /> 10.2 Review Manufacturer;s Operations and Mainteance Manuals(3 total) 3 0 9 9 21 $4,647 $210 $210 $4,657 <br /> Task 70.0 Totals S7 ZO $15 $0 E15 SO SO $37 58,263 EO $370 SO $0 $0 $370 $8,633 <br /> Total Taks 7 thru 8 = 21 34 37 T 45 42 0 186 37,722 SO j1 860 SO SO SO 5�,860 539,582 <br /> Legend: <br /> PM Project Manager <br /> PE Project Engineer <br /> MECH Mechanical Engineer (1)Project Equipment and Communication Expense.. <br /> STRUC Structural Engineer (2)Based on 110 miles per round trip @$0.56/mile. <br /> E&IC Electrical and Instrumentation Engineer <br /> CAD CAD Technician <br /> WP Word Processing/Clerical <br /> Prepared by B.Narayanan 9/30/2016 Page 1 <br /> ATTY/AGR/2016/AMENDMENTS/AMEND NO.2 CAROLLO ENGINEERS,INC. <br /> l7F\/�f1Q_70_1R\/G <br />