My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-02-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 9:00:23 AM
Creation date
2/7/2013 3:10:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
2/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.H. - Page 14 <br /> C. Coordination of Artist with sub-consultants, staff, and health department <br /> Consultant shall: <br /> ■ Facilitate one (1) design review meeting with Don Leek of Water Consultants to review the <br /> design and maintenance of the fountain with city maintenance staff. (Meeting to be held the <br /> same day as the County health department meeting.) <br /> ■ Attend one (1) preliminary and one (1) follow-up meeting with City and/or County health <br /> departments <br /> ■ Attend two (2) in-person meetings and phone meetings on an as-needed basis with RHAA to <br /> coordinate work on plaza details, and fountain equipment and hookups details <br /> ■ Attend public celebration and facilitate presentation of the finished model and drawings <br /> Subtotal for Task 1: $9,400.00 <br /> Task 2—Build and Install the Fountain with Bench Sculpture <br /> A. Construction of fountain based on city approved design <br /> Consultant shall: <br /> ■ Create rebar reinforced polymer modified fountain sculpture with benches <br /> ■ Provide plywood templates to mosaic artists for sizing and tile layout prior to park site <br /> installation <br /> ■ Plumb fountain and ground structure <br /> ■ Install push button activation <br /> ■ Create bronze fountain center piece and two bronze scuppers <br /> ■ Sculpt bird bath(s) in back of fountain <br /> ■ Create stainless steel drain plates with cut out decoration for drains <br /> ■ Begin to build surge tank <br /> $48,400.00 <br /> B. Installation of fountain <br /> Consultant shall: <br /> ■ Complete the surge tank <br /> ■ Deliver fountain and all associated material to park site <br /> ■ Provide the crane for the installation <br /> ■ Pour concrete surge tank along with footings for the structure <br /> ■ Install plumbing in surge tank <br /> ■ Install sculpture <br /> ■ Apply anti-graffiti coating on non-tile surfaces and back of fountain sculpture <br /> 11 000.00 <br /> Subtotal for Task 2: $59,400.00 <br /> ATTY/AGR/2013.012/(ARTIST)INTERPLAY <br /> REV: 01-22-13 MLG <br /> Page 12 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.