Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> The specific tasks needed to evaluate each individual project are described below and <br /> are listed in a sequence based on CEQA requirements. The tasks are intended to <br /> describe a process that is comprehensive and legally defensible, yet efficient and <br /> concise. <br /> Task 1 Review Proiect Application and Plans <br /> To orient Consultant to the individual project proposal, Consultant will review the project <br /> application and locate the individual project within the Downtown Precise Plan (DTPP) <br /> area. Consultant witl review any environmental studies (e.g., biological report, <br /> geotechnical report) submitted as part of the application to decide if the studies address <br /> and/or mitigate impacts identified in the DTPP EIR. Consultant will also note if the <br /> project application materials are missing any details that will be needed to determine <br /> potential environmental impacts. <br /> The City will provide all relevant project-specific, applicant-supplied, and City-reviewed <br /> technical reports, project plans, and other related project information. <br /> Consultant will consult with staff regarding any substantial change in the existing <br /> environment not already anticipated in the DTPP EIR (e.g., General Plan Amendment <br /> not anticipated in the new General Plan) and decide if the change could result in a new <br /> significant environmental effect or a substantial increase in a previously identified <br /> environmental effect. <br /> Product (Week 1): Consultant will prepare an electronic mail or written memo <br /> describing any missing project details and any substantial change in the existing <br /> environment <br /> Task 2 Evaluate Potential Environmental Impacts of Proposed Proiect Aaainst DTPP <br /> EIR and Mitiqation Monitoring and Reportinq Proqram (MMRP) <br /> Based on the project application materials (see Task 1), Consultant will prepare a draft <br /> CEQA Environmental Checklist Form/Initial Study (CEQA Appendix G). In the interest <br /> of time and efficiency, Consultant will first focus on the environmental topic area <br /> questions (biological resources, cultural resources, public services, etc.) and will not at <br /> the outset prepare the project description and background narrative requested by the <br /> Checklist Form. <br /> The draft Initial Study will: (1) identify the environmental impacts that could result from <br /> the proposed project (items I-XVII); (2) identify the DTTP EIR and MMRP mitigation <br /> measures that would mitigate the impacts (items I-XVII); (3) identify any new or more <br /> severe environmental impacts, if any, that could result from the proposed project (items <br /> I-XVII); (4) make the Mandatory Findings of Significance (item XVIII); and (5) make the <br /> Determination (as stated in the CEQA Checklist Form) if any additional CEQA <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 MIG DTPP ON-CALL SERVICES <br /> REV:11-18-14 VR <br /> Page 3 of 5 <br />