My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Moore, Iacofano, Goltsman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Moore, Iacofano, Goltsman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:47:57 PM
Creation date
2/19/2013 9:26:38 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Moore, Iacofano, Goltsman, Inc.
PROJECT NAME
On call Environmental Consulting services for Projects within the Downtown Precise Plan.
RMP File Number
304
Date
2/14/2013
MO Ref
13-036, 14-178, 15-180, 16-199
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
documentation is required, and what that CEQA documentation would be. <br /> If the draft Initial Study concludes that an additional CEQA document wou�d be required, <br /> the Initial Study can be used as the basis for that additional CEQA document. <br /> Product (Week 5): Draft CEQA Environmental Checklist Form/Initial Study (CEQA <br /> Appendix G)--all environmental topic areas, Mandatory Findings of Significance, and <br /> Determination. The timeline assumes that all necessary applicant-prepared and City- <br /> reviewed technical reports and City comments (PRC, AAC, HRAC) are received by the <br /> end of week two. <br /> Task 3 Review Draft Initial Studv with Citv Staff <br /> Consultant and City staff, including the City Attorney and/or City's CEQA attorney if <br /> desired by the City, will review the draft Initial Study. Based on the draft Initial Study <br /> conclusions and team review, the team will decide, if necessary, what project changes <br /> or additional project conditions could be imposed to mitigate or avoid impacts identified <br /> in the DTTP EIR so that the City can approve the project as being within the scope of <br /> the DTPP EIR. As a result of the team review, Consultant will revise the draft Initial <br /> Study. <br /> If the team ultimately concludes that a Mitigated Negative Declaration, Supplemental <br /> EIR, or Subsequent EIR is required, Consultant will prepare a concise work scope, <br /> schedule, and budget for the additional CEQA work. <br /> Products (Week 7): Revised Initial Study based on team review. If necessary, provide <br /> concise work scope/schedule/budget for additional CEQA work. <br /> Task 4. Attend Public Hearinq(s) <br /> If requested by City staff, Consultant will attend the public hearing(s) for the project, in <br /> order to answer questions regarding the Initial Study. <br /> Product (as requested): Attendance at public hearings <br /> ATTY/AGR/2014/AMENDMENTS/AMEND N0.1 M�G DTPP ON-CALL SERVICES <br /> REV:11-18-14 VR <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.