My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 213 <br /> .� KITTELSON 8c ASSOCIATES , I NC . <br /> � T R A N S P O R T A T I O N E N G I N E E R I N G / P L A N N I N G <br /> � 101 S Capitol Boulevard, Suite 301, Boise, ID 83702 208.338.2683 208.338.2685 <br /> MEMORANDUM <br /> August 20, 2012 Project#: 11637.0 <br /> Blake Lyon, City of Redwood City <br /> Michelle Littlefield, City of Redwood City <br /> Jessica Manzi, City of Redwood City <br /> From: Sonia Hennum, PTOE&Katie Pincus <br /> Project: Redwood City Costco Gasoline Expansion <br /> Subjec Preliminary Transportation Assessment <br /> David Rogers, Costco Wholesale <br /> Dave Babcock, DBA <br /> Joseph Welch, Mulvanny G2 Architecture <br /> John Ellingsen, Barghausen Consulting Engineers <br /> Steve Calcagno, Kier&Wright Civil Engineers <br /> This memorandum is an update of the Preliminary Transportation Assessment for the Redwood <br /> City Costco Gasoline Expansion provided by Kittelson & Associates, Inc. (KAI). This memorandum <br /> provides an update to the previous assessment (dated August 30, 2011) based on comments <br /> provided by the City of Redwood City in emails from April 26, 2012 and August 8, 2012, and <br /> subsequent telephone conversations in June, July, and August 2012. This memorandum has been <br /> revised to include additional information requested by the City regarding characteristic data for <br /> other Costco warehouses and other revisions as outlined in the City's email. In addition, more <br /> detailed analysis to determine if there is a relationship between Costco Gasoline facility trip <br /> generation and those characteristics has been conducted and included. Detailed discussion is added <br /> regarding an analysis comparing trip generation to fueling positions and sales volume at other <br /> Costco facilities,the findings of which conclude there is no consistent or predictive relationship. <br /> FILENAME,•H,•�PROJFILE�11637-REDWOOD CITY C05TC0-GAS EXPANSION�REPORT�REDWOOD CITY C05TC0 GASOLINE <br /> PRELIMINARY TRANSPORTATION MEMO l/6 FINAL,DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.