My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 227 �neExpansion Project#:11637.0 <br /> Huyusi�v,LV1L Ppge 15 <br /> seconds during the weekday p.m. peak hour. The maximum pump times were approximately 6 <br /> minutes and 30 seconds during all time periods. <br /> Existing Queue Mitigation Strategy <br /> Given the queuing issues currently occurring on site, the Redwood City Costco management and <br /> operations have developed a queue mitigation strategy to deal with overflow fuel station queue <br /> stacking during the peak time periods. The queue mitigation strategy used is slightly different than <br /> the conceptual plan developed as part of the initial development approvals but it works more <br /> efficiently and has less impact to on-site circulation and parking than the initial concept plan. The <br /> existing queue mitigation strategy that is used for the fuel station is illustrated in Figure 6. <br /> Kittelson&Associates,Inc. Boise,Idaho <br />
The URL can be used to link to this page
Your browser does not support the video tag.