My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 394 <br /> Michelle Littlefield, the project planner, gave an overview of the project. She gave <br /> background information of the project, noting that Costco submitted in 2005 for a total <br /> redevelopment of the warehouse. She stated that the Planning Commission had <br /> reviewed and certified a draft and final EIR for the Costco project in 2007 and thought <br /> the project was initially proposed with 16 pumps, the Zoning Administrator approved the <br /> project with 12 pumps. This was appealed to the City Council who upheld the project <br /> and decisions made by the Zoning Administrator and Planning Commission. She stated <br /> that now Costco is asking for an additional 8 pumps and gave an overview of the <br /> numbers including changes in square footage, trees and parking. She stated this is a <br /> proposal to modify the existing Use Permit application and apply for a new Architectural <br /> Permit for the expansion of the canopy for the gas station. If approved this will also <br /> require an approval of a Sign Permit for new signage on the canopy. She noted project <br /> milestones and stated that part of the evaluation is consideration as to which level of <br /> environmental review would be appropriate based on the whole record, including new <br /> information provided by Costco. She stated that Staff determined that an Addendum #2 <br /> would be appropriate and based on these conclusions the City found no significant <br /> environmental impacts or increases in previously identified impacts from the 2006 EIR <br /> for the Costco project. She noted that five comment letters were received, all by email, <br /> and spoke about one in particular. She stated the Mr. James Dombroski raised two <br /> points in his letter: the first was that the transportation impact analysis had errors, and <br /> the second was that if the project were approved by the City that a condition of approval <br /> be included that the project comply with the California Unfair Practices Act. She stated <br /> that the letter is addressing a transportation analysis done in 2006 and not the current <br /> analysis or Addendum #2 and therefore the Statute of Limitations to raise issues with it <br /> has expired. She stated that compliance with the Unfair Practices Act, as a standard <br /> procedure in the City to comply with all state, local and federal laws, is required. She <br /> introduced Aaron Carter with ICF, the consultant who helped prepare Addendum #2 to <br /> provide technical explanations regarding the comment on the 2006 transportation impact <br /> analysis. <br /> Mr. Carter spoke specifically to Mr. Dombroski's letter. He stated that the first comment <br /> relates to prior analysis, which was not used as a basis for current proposed <br /> modifications. He stated there are four basic issues raised by Mr. Dombroski and <br /> addressed each in turn. He stated that the three nearest intersections to the facility were <br /> evaluated both in the prior study and the current study and are sufficient. He stated that <br /> the letter claims that improper trip generation rates were used and noted that any issues <br /> with trip generation related to the existing facility are a moot point as it is already <br /> completed and the current numbers only reiterate what the previous study found. He <br /> stated that the sub-consultant for traffic analysis looked at trip generation rates at similar <br /> Costcos, in similar facilities with a similar orientation to this project and better data <br /> simply cannot be found for that analysis. He noted that the comment refers to ITE trip <br /> generation rates, which were not used in this analysis, as the sub-consultant's reports <br /> were very similar to ITE numbers. He stated that the most current available information, <br /> existing conditions, were used to confirm the report. He noted that any trips related to <br /> the existing facility and existing 12 pumps are irrelevant for the purposes of the proposed <br /> modifications. The new analysis and existing observed data on the ground couldn't be <br /> more accurate than it is now. He noted the claim that the prior study underestimated the <br /> level of service impacts on the surrounding intersection system and stated that <br /> comparing existing conditions on the ground now to prior analysis reveals that the prior <br /> analysis conclusions have held true. <br /> Jessica Manzi, senior transportation coordinator for Redwood City, discussed significant <br /> traffic thresholds. She stated that all three studied intersections are signalized and for <br /> Page 2 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.