My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-25 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-25 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:23:08 PM
Creation date
3/21/2013 4:47:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3.E. - Page 13 <br /> Section 3.1.$ Water Sup�lV A�reement Amendment ReQUired <br /> San Francisco may r�ot change the �xisting condition of the Hetch Hetchy <br /> Reservoir by: <br /> (1} abandoning or decommissioning O'Shaughnessy Dam; or <br /> (2) dra�ning Hetch Hetchy Reservair, except for pu�poses of(i) repair, <br /> rehabilitation, maintenance, improvem�nt, or reconstruction af <br /> O'Shaughnessy Dam or appurtenances, (ii) supplying water to the Bay <br /> Area during drought, or (iii} meeting water release requirements under the <br /> Raker Act, or f�deral or state law, <br /> unless the parties enter inta an amencfinent to t��e Water Supply Agreement, in full <br /> force and ef�ect, adopted in accordance with Section 2.03. <br /> The amendment shall state, or restake, as the case may be: <br /> A. Ttae level of service goals for seismic reliability and delivery reliability <br /> adopted by the Commission in conjunction with such propased changes to <br /> the Regional Wat�r System, provided such goals are at least as protective <br /> af the Whol�sal� Customers as the le�el of service goals adopted by the <br /> Co�runission on October 30, 20a8 in conjunctian with th� WSIP; <br /> B. The level of water quality to be delivered, which is cuzrently provided for <br /> in Section 3.08, and <br /> C. The specific cost aliocation procedures, written as an amendment to <br /> Article 5, which apply to {1} th� abandonment or decoz�nnnissioning af <br /> O'Shaughnessy Dam, or {2) the draining of Hetch Hetchy Reservoir, and <br /> (3} the developrnent, operation and maintenance of New Regional Assets <br /> that may be required to replace water supplied by HeEch Hetchy Reservoir <br /> and delivered to the Bay Area. <br /> In the event that the parties are not able to agree upon and apprave an am�ndment <br /> to the Water 5upply Agreement as set forth above, San Francisco may not <br /> abandon or decommission O'Shaughnessy Dam or drain Hetch. Hetchy Reservoir. <br /> February 5, 2013 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.