Laserfiche WebLink
6.4.A. - Page 18 ATTACHMENT 1 <br /> a. Provide publicly-accessible pedestrian and bicycle pathways alon� the water's ed�e, <br /> and connect to existin� and planned networks. <br /> b. Provide docks and/or develop pedestrian/bicycle networks to connect the project to <br /> existin� marina(s) when possible. <br /> c. Provide Quasi-Public or Public usable open space amountin�to at least 10 percent of <br /> the proiect area adiacent to the water's ed�e. Useable open space shall include <br /> enhancements to support its use, such as benches, trails, and landscapin�. Si�na�e <br /> and appropriate public access to the usable open space shall be provided to clearly <br /> indicate that the space is available for public use. <br /> d. A public access easement shall be recorded a�ainst the propertv that ensures public <br /> access to the portion of the proiect which qualifv it for the FAR Bonus. <br /> 16.4- Outdoor Equipment and Facilities. <br /> A. Trash and refuse collection and disposal facilities, and recvclin� facilities shall be <br /> enclosed bv a solid fence and screened with permanentiv maintained landscapin�. <br /> B. Outdoor �enerators and equipment tanks shall be screen from public view bv a <br /> structure or landscapin�, shall meet all applicable safetv standards, and shall not be located <br /> within a required parkin�stall. <br /> 16.5- Minimum Pervious Area and Stormwater Requirements. <br /> A minimum of 40 percent of each lot shall be pervious area, to be composed of landscapin�, <br /> ve�etated open space, or permeable pavin� materials, consistent with the provisions of Section <br /> 32.12 of the Zonin� Ordinance. All development is also subiect to the requirements of Chapter <br /> 27A (Stormwater Treatment Measures and Maintenance Pro�ram) of the Municipal Code. <br /> ATTY/ORD.387/GP ZONING ORD MIXED-USE NEIGHBORHOOD DISTRICT UNDER ARTICLE 54 <br /> REV:03-06-13 PT <br /> Page 15 of 86 <br />