My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�mpact: Construccian of the project wauId result in�ot•al of�and could resul�t in <br /> inadvertent damage ta trees. Tree health may decline during post-conslruction de�e <br /> to the chat�ge in project site oonditions. <br /> Mil3gation: Mitigation Measure Biology-3: The applicant sh�ll submit Iandscaping Plans fnr <br /> the r�view and approval of the City of Redwood Planning,Ha�sing,and <br /> Economic Developmenfi Depariment and the City Landscape Architect Pnox to <br /> building permit issuance for each phase of the project.A laudscaping plan ahall be <br /> submitted for the c�nstructian activxties in Phase I,and separate landscaping pla,ns <br /> shall he su�amitte�for ea��t of t�e residen�s in Phase II.The landscaping plan <br /> shall indicate the species,place�ne�t, and si�e of all new pnopase�i treee and <br /> shrubs. T�ae landscaping plan shall be required to meet the species,plar�eanent, and <br /> minimum size requirements as outlined by the City Landscape Architect. <br /> Minimum tree size for replacement trees shal�be na smaller than 15 gallcros. The <br /> landscaping p�an sha11 alsa indicate which of the younger exis�ing trees nn the site <br /> may be suitable for transp�antation.Tre�transplantataon may be required at the <br /> discretion of the City Landscape Architect. Mitigation Measure Bialogy-3 <br /> indir,ates that�he m.in;m�m replacement tree size sha11 be 15 gallons. �tudies�ave <br /> shown that the ginwth rate of s�ch smallea�sized irees of�en exceeds�hat of mrne <br /> mature 24iach box or 36-inch bax�pecimens,likelp due to the younger tree's <br /> geater ability ta adapt ta its new environment. While a 24-inch or 3b-inch bQx <br /> tr�e�nay be able to provide greater screening initially, 15 gallvn trees tend to <br /> provi�le rnature screening in a ahorter span af tirne. <br /> Mttigation Measure Biology-12:Nane of the�45 txeea groposed for removal in <br /> Phase II maybe removed until the applicant h�.s comp�ied with mitigation <br /> measure Biology 13. The removal of these 45 trees sha11 be reviewed an a lot by <br /> lot basis�s each property ovvner raquest�a buildi.ng permit far each residence. <br /> Approval for tree r�novals shall be granted cancurrently with residential building <br /> permits. <br /> Mitigation Mea�ure Biolagy-13: U�on submittal af an improvement agreement <br /> and plan for the raadway,util.ity,and drai�age improvements and/or building <br /> perm:its fnr individua�bu.ilding permits for construction ofr�sidence�,the <br /> applicant or individuallot owner shall submit a tree valuation report identifying <br /> the number of trees to be removed from the lot{s) and their vaiue based on <br /> speeiea, size, aad candition far review and appmval by���it3+���pe <br /> Architect. The report shall include detailed plans for the replacement of�he <br /> remaved trees. Trees rnust be replac�in 1Qnd and qu�ntrtY to t�►e sa�isfaction af <br /> the City Landscape Architect. The applicant sha11 comp�y with the appraved <br /> report,including implementation of the tree replacement plan. <br /> Mit�g�.tion Measure Biolagy 1��:A certi.fiec�a�orist, registered consultin8 <br /> arborist,ar registered professional forester shall be re�tained ta act as the Project <br /> Arborist. The Project Arborist's rale shall be to monitax conshvction activities <br /> that may impact the health of the trees onsi�e. This monitoring activity shall <br /> include ensuring that t�e applicant a�dh.eres tfl and implemerits the Tre�Protection <br /> Fl�n.(Ra1ph()stexling Co�suttauts 2007),whioh shall include: <br /> �5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.