Laserfiche WebLink
� Pre-Canstruction Activities: trees checked for c�eatance of construction <br /> �uipment aud vehicles,tree remavals pex£nrmed�efone construction, <br /> necessary pru.ning,removal of stumps adjacent to protected troes,er�ection af <br /> tr�ee protectian barriers,posting of warning sigt�s,wrapping of trunks of <br /> protected tce�s, as well as alI necessary maintenance ac�ivities such as <br /> watering and mulching. <br /> � Activities during Project Cansixuction: edditiona�lree pruning for clearrance, <br /> root pruming,watering,maintensnce of tree protective fencing,regular <br /> inspections for plan conformance and tree health,completian of wzilteyn <br /> report foIlowiz�g each inspection. <br /> � Post-Canst�uctaon Activiti.es:maintenanoe of grotected trces, <br /> coznmencement vf scheduled moaitoring as indicated in mitigation measure <br /> Biology-13. <br /> Mitigation Measnr+e Biology-15: The CC&Rs for the project site aha31 inciude <br /> provisimYS for the maintenanoe and protsctioa of a11 troes wit�in the project area. <br /> 'Th�se provisions shall include the prot�ion af signifi�t tree resou�in the <br /> project area both during and after ail consiruction activities.The plan shall,at a <br /> minimum,ino�ude that all earisting trees wit�►a trunk diameter of 12 inclxes or <br /> more, and all replacement trees,be inspected for hazard patential and <br /> maintenance by a certifie�arboris�,regi�tered consulting arbarist,or a registered <br /> professivnal forester ance e�►ery two years. <br /> Mitigatian Measare Biolo�y-16: The applicant shall acld provisions within the <br /> CC&,Rs for the re�alacement af trees,vegetatian,andfor landscaping if said <br /> cl,ements fail tv survive. Replaceme�at of trees,vegetation,or Iandscaping shall be <br /> in kind,both in quality and quant�t�r, a�nd shall be installet�within 90 ctays of the <br /> �ea.th of the previous vegeta#ion. <br /> Flnding: Implenaentati.on of Mitigatao�Measures Bialog,y-12,Biolog�13,�end Biology-14 <br /> wou2d reduce oonstruction impacts to tress to be Iess tha�a si$z�ificant. <br /> Tmglementation of Mitagation Measure Biology 15 and Biology-16 wnuld reduce <br /> post-construction unpacts to trees t,�be Iess than significan�. <br /> Fact�fn Snpport of�nding: Mitigation Measure Biology-3 would requixe submittal of <br /> landsca�ing plans,including standards for rnini�nwn bree rePlacetnent size,#a <br /> protact trees and tree health,resulting in a less-t.�an-sigx�ificant level. <br /> Mitigation Measures Bio�ogy-12 and Biology-13 wauld require submittal of a tree <br /> valuation report and review of the report by the City Axborist priar fo remov�l o� <br /> certain tre�,which would avoid significaat impacts to trees.Mitigation Meas�ure <br /> Bialogy-14 requires utilizatian of a Project Arborist during construction Snd post- <br /> coastrructio�a to ensure adherence to the Tree protection P�an,which wou�.d avoid <br /> significant impacts to trees and tbeir health. <br /> 16 <br />