My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Measures�iology-15 and Biology-16 r�uire CC&Rs that pxovide for <br /> maintevance,protection, and replace�nent oftrees,which will avoid sigaificant <br /> impacts Yo�r�s and tr�e hea�th. � <br /> Fnipa�t 3.3-5 and proposed mitigation is deacribed on pages 3.3-19 t�r�ugh 3.3-21 <br /> of the Draft EIR and pages 4-15 t�ough 4-16 of the Revised Finsl EIR,which are <br /> hereby i�corporated by reference. <br /> CULTTJRAI,RESOURCES <br /> impact 3.4-1 <br /> ImpacY: The projeck would have the potcntial to cause a substantial adverse change in the <br /> siguificance of a historical resource as defined in §15064.5 through grouud <br /> disturbing actavities as part of the proposed projeet. <br /> M�Higatfon: 1V�ftigadan Mea�are CaItural Resavrces-i: Excar►ation�ontraots <br /> shall include warning langn�age in the General Specification section ta a�ert the <br /> �nhactox ta the poteniaal.for subsurface cultu.ral resources. <br /> Mit�igat�ion Mea�nre CuIh�ral Resonrceg-2: In the event that cutt�ral materials <br /> are expased or discovered during site preparation or subsurface can�truction <br /> activities, oper��ians shall stop all work within 30 feet of the find and a qualified <br /> professional archaeologist would be contacted for evaluatirnn and fiuther <br /> reoommeadations.If a discavery is deternuned to be a bistorical or unique <br /> archaealagical resource, and if avoidauce afthe resouree is not poss��ble,the <br /> �rchaealogicsl ar cul.tiu al resourc:e consultant shall prepare and implement a <br /> Cultural Resources Management Plan acc�ptabie to the City of Redwood City to <br /> trea�t�e resource. Potenl�al reoammendations cauld include evaluation, <br /> col�ectian,recordatioa, and analysis of any�igxiificant cult�ura�materiala followed <br /> by a professianal report. The applicant shall comply with al1 recommend�tion� <br /> presented in the approve.�G�ltural Resources Managernent Flan at all times. <br /> FInding: Implementation of Mitiga#ian Measures Cultural Resources-1 and Cultural <br /> Resources-2 vvould reduce impacts ta euidisoovered historical�nd culturaa <br /> �sources to a less-than-significant level. <br /> Faets in Suppart of k�ncling: Iu�plenn,c�ta,taon af Mitiga�ion M�asure �tural Resources-1 <br /> would reduce impacts to histori�snd cultural resaurces by requiring wa�ing <br /> lenguage in exea�atian cant�raaats informing vonshuction personizel ixtvolved with <br /> site clearing and gra,ding that there is a potential for dis�veay of historical a�ad <br /> cultural materials.If�istorical or cultural resources�re encounteted,Mitigation <br /> Measure Cultural Resources-2 reduces ircEpacts to these resources by halting <br /> grading and excavatian wark within 30 feet of the find(s)to allow the qualified <br /> archaealogist to evaluate th�find and make sure i�napaets ta the cultural <br /> resource(s)are avoidad and a Cultural Resow�cea Management Plan is prepared, <br /> as de.scribed on page 3.4-7'of the Draft EIR and page 4�1 b of the Revised Final <br /> EIR,wluch are hereby inoorporated by refe�renoe. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.