My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5UMMARY OF RESPQNSES TQ COMMENTS ON THE EIIZ <br /> imPacts. <br /> The impacts tn neighboring pmperties,includzng trus,vrill be svoided or mitigated to levels below <br /> significanc�. <br /> The impacta of�tarmwater runoff,drainage,and erasian have be�n addre�sed thronSh 1moJect design and <br /> mitigation measunes. <br /> The pmject will not cauBe significant�had,nw casting. <br /> Thc noise effects related to hillside topographic effects will not be significant <br /> Tb.e pro�ect design and mitigation measunes will avoid or reduce significant innpacts r�lat�l to lands�ides. <br /> The mitigation meas�res are adequate tfl reduce impacts to a less than signi6cant le�el. <br /> The replacement of trees conforms ta City requirements. <br /> The landscape plan screen�ng adanesses visaal conoerns. <br /> Air quality impacts of the pmject are adequat�ly addressed for construction of infrastructu�t+e and new <br /> residences. <br /> Biologists deternlined that the$reenbelts are adequate to avoid signifieant effe�ts ta wildlife. <br /> The City finds the safety p�sus and fuel management plans included in the EIR ane sufficient bo address <br /> potential fn�e hazards. <br /> The EIR has taken the potential impacts into consideration and the E�t is adequate given project desiga <br /> and mitigation mcasuns included in the EIR. <br /> T�Emerald Lake Heights Sewer Maintenance District and the piping infrastructure have the capacity to <br /> serve the residences t�at�re graposed tn c�aimect to the Di�trict. <br /> The City finds that t,�e,Arborist neport is u�nbiased and adequately addresses the impacfs of the project. <br /> The alternatives wauld nat hav�e signifiicantly reduced impac#s and would not be consistent with vvhat ia <br /> allawed by thc City's z,�ning ordinanc�. <br /> Th�City finds that the air quality�nalysis included in the I)ra8 EIR is�dequate and�ccurately adckesses <br /> canstructiou related impacts to air quality. <br /> The City finds the 1�-gallon repla�ement�ees will mature and will restore the nual,�'omst-like charac�er <br /> of the neighborhoad. <br /> The Cxty finds that the pzoposed.size of t�.e homes is consistent with the zanin8 or�dinance sud other <br /> �ames approved iiz the area. <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.