My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-04-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2013 4:33:22 PM
Creation date
4/18/2013 5:01:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 2 <br /> This debt service charge is significantly reduced from previous years and the remaining <br /> bond is scheduled to be paid off in 2017. Projected revenue, less debt service and less <br /> transfer to the Gas Tax Construction Fund leaves an available balance of $8.4 Million in <br /> FY 2013-14 for programming from the UUT. Together, with an existing fund balance of <br /> $3.0 Million, results in $11.5 Million available for programming. <br /> The Capital Project Fund replaces and upgrades the city's infrastructure and public <br /> facilities. CIP projects and programs proposed to receive Capital Project Fund funding <br /> are reviewed by the Department Directors and the City Manager, and are evaluated <br /> based on their potential to: <br /> • Support City Council Strategic Initiatives: <br /> o Community Building and Communication <br /> o Economic Development <br /> o Government Operations <br /> o Public Safety <br /> o Transportation <br /> o Youth <br /> • Save or reduce operating costs <br /> • Increase workflow efficiency through consolidation or standardization <br /> • Extend the useful life of infrastructure with minimal investment <br /> • Enhance public health, life, and safety, or if required by mandate <br /> 2. Gas Tax Construction Fund — Transportation (Measure A) Fund - Grants and Fees <br /> Fund <br /> Traffic calming, roadway management, pedestrian/bicycle safety, and local and regional <br /> transportation planning efforts are all supported by these funding sources. The Grants <br /> and Fees Funds is funded in part by Traffic Impact Fees that are generated by new <br /> residential and commercial development. These funds total $3.7 Million ($1.2 Million <br /> Gas Tax Construction Fund, $1.2 Million Transportation Fund, $1.3 Million Gas and <br /> Fees Fund) respectively. <br /> 3. Enterprise Funds: Water Improvement Fund (WIF) and Sewer Improvement Fund (SIF) <br /> Upgrading and replacing undersized and deteriorated infrastructure is an essential core <br /> service, necessary for long term viability of water and sewer systems. The City funds <br /> the reconstruction and replacement of water and sewer facilities through these <br /> enterprise funds. These programs are essential for service reliability, including disaster <br /> preparedness and response. Funds are appropriated from fees collected from rate <br /> payers specifically for these improvements. Water Improvement Funds programmed in <br /> FY 2013-14 total $6.0 Million. Sewer Improvement Funds programmed in FY 2013-14 <br /> total $6.2 Million. This is a significant increase in water and sewer fund programs and is <br /> made possible by a higher available fund reserve and a deferred payment to SBSA for <br /> sewer CIP projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.